View Issue Details

IDProjectCategoryView StatusLast Update
0001392K18X001.00 SKB SWANGeneralpublic2025-04-07 10:12
Reporter(PM) Carey LuAssigned To(HW) Sean Chiang Due Date
PrioritynormalSeveritys6-featureReproducibilityN/A
Status closedResolutionfixed 
Summary0001392: ALT weekly review meeting
DescriptionALT weekly review meeting materials will be updated here.
TagsNo tags attached.
Attach Tags

Users monitoring this issue

User List (ALTech) BY Lee , (ALTech) HY Lee , (ALTech) Hyunsik Kim , (ALTech) JW Kim , (ALTech) Lonnie Kim , (ALTech) SH Son , (ALTech) Sophie Lee , (ALTech) Sun Choul Joung , (ALTech) SY Yoon , (HW) Cooper Kung , (HW) Sean Chiang , (HW) Tom Lee , (PM) Canon Hsieh , (PM) Christine Huang , (PM) Eva Sun , (PM) Sheila Tu , (RD) Fu-chiang Young , (RD) Jay Lin , (SW) Jacky Chiang , Rick Chen

Activities

(PM) Carey Lu

2021-11-12 10:44

no access  

(ALTech) SY Yoon

2021-11-12 17:02

developer   ~0008727

Hi Carey Lu,
I summarized our weekly meeting minute.
If I have any misunderstandings, then please let me know.
1. HW
    - FT2 Fail issue in the factory.
      Foxconn is checking on acoustic chamber issue and speaker failure issue now.
      Foxconn will provide as follows
              - FT2 failure rate
              - whether Foxconn VN has Golden sample for acoustic test equipment
                Acoustic test equipment Test result with Golden sample
      Foxconn think that failure rate of FT2 is less than 10%.
      But if failure rate is above 10%, then Foxconn should check with Golden sample even though Factory is busy for MP.
    - Speaker Cable Data sheet
       If there is no change on datasheet, then there is no issue to prepare PN and its process.
    - Audio noise issue
       Foxconn will provide defect sample to ALT.(Button issue and audio noise issue units)
    - 2nd source introduction
       Foxconn provide status of 2nd source introduction for both Eagle and SWAN by e-mail.
       Foxconn is checking on e-PHY chip, and currently Foxconn has e-phy through put issue only.
    - Void issue
       ALT will comment on document that Foxconn provided by 11/15.
    - INKEL housing quality issue
      ALT asked to check housing issue to Mr. Jim.
      ALT is waiting for Jim's feedback nopw.
    - Golden sample
      ALT will update Golden sample by next week.
    - EPD for Eagle
      Foxconn will provide electricity consumption data for Eagle production next week.
    - BT Module
       ALT provide other vendor(MOVON) BT module to Foxconn.
       It is already tested on RF part for BQB.
       Foxconn confirm that there is no issue on layout.
       Foxconn keep reviewing and inform when they have question.

(PM) Carey Lu

2021-11-18 19:30

no access   ~0008748

Hi Mr, Yoon,

Please see attached file for meeting materials tomorrow. Thanks.

(ALTech) SY Yoon

2021-11-19 12:52

developer   ~0008754

Hi All,

I share today's meeting minute.
If anyone find my misunderstandings, then please let me know.
And it should be update before next weekly meeting.

    1. Eagle
        a. 2nd source introduction
                      . BT Solution should be chosen by ALT.
                        BQB certification cost for Movon Module will be provide by FII Biz Team.
                      . E-Fuse
                        Foxconn reviewed 2nd sources(GMT/Maxim/Onsemi).
                        But Foxconn found that other part is using same component.
                        So Foxconn will keep using TI e-fuse instead of others.
    2. Factory
        a. Void issue
                        Temperature of Reflow profile is higher than high limit of FFC connect.
                        Foxconn found another solder paste and inform it to Factory.
                        Foxconn will inform to ALT about the test plan when they receive plan from factory.
                  Foxconn will provide FFC connector data sheet to ALT.
    3. HW
        a. Acoustic testing Equipment.
                        ALT commented the review result for Foxconn test result of acoustic chamber.
                        Foxconn will feedback about ALT's comment after their review.
                ALT asked Golden samples.
                        Golden sample :
                    Foxconn will review ALT's comment on mantis.
                    And they will change test criteria and apply it MP.
                                If there is no issue, then Foxconn check the samples
                                that has all the measurements are in the middle of criteria.
                   Cost and Q'ty of Golden sample should be discuss when test result is OK.
        b. Audio noise issue
                    Factory sent 2 samples to ALT on 11/18.
                        Factory also sent 2 samples to Foxconn TW.
                        All the defect sample for Foxconn are audio noise defect samples.
        c. 2nd source introduction
                Foxconn provide 2nd source test report on Mantis.
                        ALT will review the report and feedback by next Monday.
                2nd source introduction plan :
                     P2P components : SWAN - 1 week delay due to FFC Cable
                                                                 Eagle - keep schedule.
                     Non P2P components : It should make again after finalize cost issue.
        d. Ask to help on PN changing process of Foxconn
                        Foxconn need ALT's help to reduce internal process in Foxconn.
                Foxconn will provide an e-mail on it.
                        ALT will feedback after review the e-mail from Foxconn.
    4. Production Plan
        a. Production Plan update
                     Current Production plan is not enough.
                        Foxconn should make new plan to increase the q'ty of delivery within this year.
                ALT will have meeting with SKB next Thursday on delivery plan.
                Foxconn should make new plan and provide it by next Wednesday morning.
                        Foxconn should update to ALT whenever Foxconn have any update on FFC delivery.

(PM) Carey Lu

2021-11-25 19:32

no access   ~0008787

HI Mr. Yoon,

Please see attached file for the meeting tomorrow. Thanks!

BR,
Carey

(ALTech) SY Yoon

2021-11-26 20:04

developer   ~0008792

Dear All,

I summarized Meeting minute as follows.
If I have any misunderstandings, please let us know.

1. HW
     A. Acoustic testing
                Foxconn will provide test data after calibrate microphone location.
                Air leakage test spec. change
                       Foxconn will keep current spec. And Foxconn asked Factory to improve little gap caused by assembly.
                       Foxconn will update why Foxconn want to keep air leakage test spec. on mantis.
    B. Speaker cable PN
                PN should be created by 11/26. It is almost done.
                Foxconn will update it by this week.
     C. Audio Noise issue
                Foxconn received 2 defected samples. But Foxconn didn’t reproduce it yet.
                Foxconn will update their review result by 11/30.
                ALT already received 2 defected samples. But one is button issue and the other is audio issue.
                ALT reproduced issue. It happen 2/100. ALT will update their review result next week.
    D. 2nd source introduction
                Foxconn will divide 2 phase for 2nd source introduction.
                1st phase for P2P components :
                       LDO : Ti->3Peak(TPL740F25-5TR),
                                  Diodes -> 3Peak(TPL740F18-5TR)
                       DC DC C : Silergy-> Fiti(FR9850S6) -> TMI
                                  Currently TMI component is using now. And there is no plan to change DC DC Cov.
                        Buffer IC : NEPERIA -> Diodes(74LVC125AT14-1)
                2nd Phase for P2P and Non-P2P
                E-PHY : Realtek -> Motorcomm
                LED Driver : TI -> Awinic(AW21024QNR)
                DC DC C : MPS -> TMI(TMI3343B)
                        LED Driver : TI -> Awinic(AW21036QNR)
                        DC-DC C : Silergy -> Halo Mic(HL7593)
     E. FFC cable issue.
                Foxconn need defected cable and SoC b’d to check root cause.
                ALT will send 3 defected cable and a SoC B’d.(It will be sent 11/27 by Fedex, Tracking no. is 775315735436)

2. Factory
     A. Visual Inspection document update
                ALT will update visual inspection document by 12/3
    B. Void issue
                Foxconn RD will discuss with Factory and feedback to ALT on mantis comments.
     C. DFM Review
                Item 13 : Design issue - Button issue
                                 ALT will update INKEL’s updated mold drawing and effective date by next week.
                                 Foxconn will update the option that INKEL can assemble button PCBA on Top cover if Foxconn can provide PCBA.
                Item 17 : Housing Issue - Protection film
                         Foxconn factory will provide some information to ALT about protection film.
            Item 19 : Gap issue
                         ALT ask Foxconn to check long term solution and short term solution.
                               ALT will update the spec. of gap issue on Visual inspection document by 12/3.
    D. Ferrite core
                It was waiting customers clearance. But it just passed today.

3. Eagle
     A. OTA issue
                Foxconn provide document on OTA issue by e-mail.
                ALT will make document and provide it to SKB.
                Foxconn cannot use Factoryreset API of SPTek because it is java code.
                So if MW vendor provide some low level factory reset API, then Foxconn can use it for factory SW
                Foxconn and ALT will discuss about OTA test after control run.
    B. 2nd source introduction.
                Fiti Reset IC was EOL. Foxconn will provide reliability test result by early of Dec.
                So 3Peak Reset IC should be confirm by the end of Dec.

Best regards,
SuhYoung YOON

(PM) Carey Lu

2021-11-30 19:04

no access   ~0008810

HI Mr. Yoon & SH,

Please refer to attached file for the FFC cable FA report provided by VN factory.
Thanks~

(ALTech) Lonnie Kim

2021-12-01 10:23

developer   ~0008815

Hi, Carey
 
Please refer to attached ALT feedback.
Please let me know if you have any questions.
I will arrange CC about discussing our feedback.
 
Best regards
 
Lonnie Kim

(ALTech) SY Yoon

2021-12-01 19:15

developer   ~0008821

Last edited: 2021-12-01 19:28

Hi Carey and Sean.

I updated current status to you. Please check it and feedback before weekly meeting that you didn't check it.

    1. HW
        a. Acoustic testing
Foxconn will provide test data after calibrate microphone location.
Air leakage test spec. change
     Foxconn will keep current spec. And Foxconn asked Factory to improve little gap caused by assembly.
     Foxconn will update why Foxconn want to keep air leakage test spec. on mantis.
[ALT 1201] Foxconn update mantis(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=911)
                   We will comment if we have any question and feedback.
        b. Speaker cable PN
PN should be created by 11/26. It is almost done.
Foxconn will update it by this week.
        [ALT 1201] Foxconn provide temporal version PN, such as
                FPN: JS4AI20-CMXX06: 4AI20-CMXX06
                FPN: JS4AI20-CMXX07: 4AI20-CMXX07
                    Is it OK to procedure Foxconn internal process ?
        Your engineer said that you should do something to make permanent PN.
        Please let me know what and when we should do permanent PN.
        And why do you make temporal PN ? Is it for your internal process ?

        c. Audio Noise issue
Foxconn received 2 defected samples. But Foxconn didn’t reproduce it yet.
Foxconn will update their review result by 11/30.
ALT already received 2 defected samples. But one is button issue and the other is audio issue.
ALT reproduced issue. It happen 2/100. ALT will update their review result next week.
[ALT 1201] Foxconn tested a defected unit. The Failure rate was 6/50.
                    ALT provide to HW change to avoid this issue. Foxconn reworked and test again, but there is no issue.
                    ALT will give ECO on this soon.
        d. 2nd source introduction
Foxconn will divide 2 phase for 2nd source introduction.
1st phase for P2P components :
                LDO : Ti->3Peak(TPL740F25-5TR),
                        Diodes -> 3Peak(TPL740F18-5TR)
                DC DC C : Silergy-> Fiti(FR9850S6) -> TMI
                    Currently TMI component is using now. And there is no plan to change DC DC Cov.
                    Buffer IC : NEPERIA -> Diodes(74LVC125AT14-1)
                    2nd Phase for P2P and Non-P2P
                           E-PHY : Realtek -> Motorcomm
                           LED Driver : TI -> Awinic(AW21024QNR)
                           DC DC C : MPS -> TMI(TMI3343B)
                LED Driver : TI -> Awinic(AW21036QNR)
                DC-DC C : Silergy -> Halo Mic(HL7593)
        a. FFC cable issue.
            Foxconn need defected cable and SoC b’d to check root cause.
            ALT will send 3 defected cable and a SoC B’d.(It will be sent 11/27 by Fedex,
            Tracking no. is 775315735436)
            [ALT 1201] Foxconn update their first review on Mantis(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1392)
                   ALT reviewed it and feedback to Foxconn on Mantis.
 
    2. Factory
        a. Visual Inspection document update
                    ALT will update visual inspection document by 12/3
        b. Void issue
                Foxconn RD will discuss with Factory and feedback to ALT on mantis comments.
        c. DFM Review
                      Item 13 : Design issue - Button issue
                ALT will update INKEL’s updated mold drawing and effective date by next week.
                Foxconn will update the option that INKEL can assemble button PCBA on Top cover
                if Foxconn can provide PCBA.
                                [Foxconn] Foxconn cannot provide PCBA to INKEL due to internal policy.
          Item 17 : Housing Issue - Protection film
                           Foxconn factory will provide some information to ALT about protection film.
          Item 19 : Gap issue
                           ALT ask Foxconn to check long term solution and short term solution.
                           ALT will update the spec. of gap issue on Visual inspection document by 12/3.
                [Foxconn] There are no improvement on short term solution. But ALT asked some photos of it.
        d. Ferrite core
                     It was waiting customers clearance. But it just passed today.
 
    3. Eagle
        a. OTA issue
            Foxconn provide document on OTA issue by e-mail.
            ALT will make document and provide it to SKB.
            Foxconn cannot use Factoryreset API of SPTek because it is java code.
            So if MW vendor provide some low level factory reset API,
            then Foxconn can use it for factory SW
            Foxconn and ALT will discuss about OTA test after control run.
            [ALT 1201] ALT provide how can factory SW do factory reset. And Foxconn RD tested it without issue.
                     Foxconn create mantis for discuss OTA test in factory.(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1403)
            
        b. 2nd source introduction.
            Fiti Reset IC was EOL. Foxconn will provide reliability test result by early of Dec.
            So 3Peak Reset IC should be confirm by the end of Dec.
Best Regards,
SuhYoung YOON

(PM) Carey Lu

2021-12-02 18:57

no access   ~0008831

Hi Mr. Yoon,

Please see attached file for meeting materials tomorrow. thanks!

(PM) Carey Lu

2021-12-09 19:13

no access   ~0008889

Hi Mr.Yoon,

Pls see attached file for tomorrow's meeting. Thanks!

BR,
Carey Lu

(PM) Carey Lu

2021-12-10 18:36

no access   ~0008903

Hi Mr. Yoon,

Please see attached file for DFM issue review. thanks!

(ALTech) SY Yoon

2021-12-10 19:02

developer   ~0008904

Hi Ms. Carey Lu,

I summarized today's meeting minute.
If there is any misunderstandings, please let us know.

1. HW
        a. Acoustic testing
                    Foxconn will update on Mantis about freq. change request(1KHz->400Hz) by ALT.
        b. Audio Noise issue
                    ALT shared EMI test result on ECO for Audio noise issue(12/9).
                    Foxconn can apply this after 1 ~ 2weeks later after ECO Process.
                    ALT asked to apply this change to defected unit during the mass production from now on.
                    Foxconn will check and feedback by 12/13
        c. 2nd Source
                    ALT feedback on E CAP on mantis.
                    ALT gave feedback on Diodes. ALT asked to check after apply Audio noise issue ECO.
        d. FFC Cable
                    Foxconn got feedback from Vendor that there is no issue on defected FFC Cable thickness, but it is Chinese version.
                    Foxconn will provide English version when they receive from their vendor.
                    Connector vendor will review the issue by 12/10. Foxconn will provide their review result to ALT.
            ALT asked Foxconn to check that there is any strength spec. on shield material of FFC cable.
                    Foxconn will check it and feedback to ALT.
               Factory report is under internal process for approval to send.(ALT received it after meeting.)
    
    2. Factory
        a. Void issue
                    Foxconn is waiting for new solder paste.
                    ALT asked to check that reflow time change.
                    Factory will test it on next Monday for 100 pcs. And they will take x-ray pictures to validate it.
                    ALT asked solder paste data sheet.(ALT received it after meeting).
        b. DFM
            i. Button Ass'y test
                            INKEL will provide 2.5K component by air ASAP.
                            Those top covers applied some improvement on Button hole. Those are enlarged about 0.2 mm.
                            INKEL and ALT are reviewing additional solution to improve button assembly now.
                            Foxconn can test that Foxconn assemble Button ass'y in their factory for 100 pcs.
                            And Foxconn review the what the reason of button defects are. And they will provide it to ALT.
                            For this test, ALT will inform when INKEL can provide button components without assembly.
            ii. LED Side bracket assembly
                    INKEL will provide EVA gasket for boss. They will make EVA Gasket and attach it on boss.
            iii. Protection film.
                 INKEL accepted Foxconn's suggestion. They will prepare the material for it.
                             ALT will check when INKEL will use new protection bag for delivery.
                 ALT find some protection film and INKEL will test it.
                             ALT will inform when we get report from INKEL.
            
    3. Eagle
        a. 2nd source Introduction
            i. BT Module.
                            ALT and Foxconn biz team are discussing about it.
                            Foxconn asked ALT to finalize. The Cypress chipset status is getting worse.
            ii. No. of samples for ALT
                            1st phase of 2nd source is Reset IC only.
                 ALT will check to reduce no. of samples after reviewing Foxconn's reliability test result.
Best Regards,
SuhYoung YOON

(PM) Carey Lu

2021-12-16 19:08

no access   ~0008934

Hi Mr. Yoon,

Please refer to attached for meeting materials tomorrow. Thanks!

BR,
Carey

(ALTech) SY Yoon

2021-12-17 18:20

developer   ~0008947

Hi Ms. Carey Lu,

I summarized today's meeting minute.
If there is any misunderstandings, please let us know.

1. HW
    a. Acoustic testing(911)
            INKEL Housing will arrived in VN by 12/20.
            Foxconn can provide acoustic chamber test result for 100 pcs by the end next week.
            But it depends on the material status.
    b. Audio Noise issue
            Foxconn cannot apply ECO for defected units during MP before ECO Process complete.
            So Foxconn will keep defected units before ECO process complete, and ECO will be applied after ECO process complete.
    c. 2nd Source
            Electronic capacitor
                 Samyoung rejected to provide their parts to Foxconn through Foxconn's agent.
                 Samyoung wants to provide their parts to Foxconn directly, but it is impossible that they are not in QVL.
             Even though ALT provide LOA, Foxconn top management may not accept it.
                 So Foxconn need another vendors.
                 Foxconn checked another vendor's LT, but it was more than 300 days, such as Nichicon, Panasonic and
                 Rubycon. So Foxconn wants to use SUSCON and LELON.
                 But ALT cannot accept to use SUSCON and LELON due to those vendor are not reliable.
                 E-Cap is very critical parts so ALT wants to use those parts from reliable vendors.
             Foxconn asked ALT to provide ALT opinion via e-mail from Mr. Steve Lee.
                 ALT sent e-mail today.
    d. FFC Cable
             Connector vendor sent defected sample to their HQ in Japan on 12/14, and it will arrived today.
             Connector vendor will inform when they can provide analysis report after receiving defect samples.
             Foxconn hope that it will be provided by next week.
         Cable vendor didn't provide their review report in English yet.
             They suggested pin configuration change, but it may need PCB change. So it is difficult to accept.
             Foxconn applied short term solution since 11/27, and they keep applying until the solution is finalized.
2. Factory
    a. Void issue
            Foxconn will check the feedback of ALT by today.
3. DFM
    a. Item 13 Control run to find the root cause of Button ass'y issue.
        Foxconn will check whether this control run may impact delivery schedule and inform ALT.
            ALT will check the when INKEL can provide those parts for control run.
    b. Item 33
        Foxconn accepted to use old housing up to 25K.
            Foxconn will rework for removal side LED boss up to 13K.
            But Foxconn cannot rework after 13K delivery.
        Both parties Biz teams should discuss who should do rework and who should pay for it.
    c. Item 17
        Top cover package will change from Jan. 2022.
            ALT check exact date with INKEL can provide new package.
    d. Item 19
            ALT will check with INKEL when INKEL can provide short term solution and inform Foxconn by today.
4. Eagle : 2nd source Introduction
    a. e-Phy
            Foxconn will make 10 units for development.
            If there is no issue during development, then Foxconn will start control run.

Best regards,
SuhYoung YOON

(PM) Carey Lu

2021-12-23 17:28

no access   ~0009068

HI Mr.Yoon,

Please refer to attached file for meeting tomorrow, thanks!

BR,
Carey

(ALTech) SY Yoon

2021-12-24 21:52

developer   ~0009144

Hi Ms. Carey Lu,

I summarized today's meeting minute.
If there is any misunderstandings, please let us know.

1. HW
    a. Acoustic testing(911)
             Foxconn can provide acoustic chamber test result for 100 pcs by the end next week.
    b. Audio Noise issue
             Foxconn factory will finish control run for ECO by today(12/24)
             If there is any issue, then ECO will apply from next Monday(12/27)
             Foxconn will provide result of control run by today.
    c. 2nd Source
             Electronic capacitor
                  Foxconn asked ALT to check that ALT can provide Samyoung E-Cap as B/S material.
                  ALT will discuss internally.
         1st Build
                  Foxconn started 1st build in this week, but it will finish by 12/28.
              Foxconn can send samples the early of next year.
              Foxconn asked ALT to pay delivery cost. ALT will discuss with Biz team and feedback soon.
    d. Designated Parts
         Foxconn asked ALT to send an e-mail to designate IR sensor.
             Foxconn purchasing team delete VISHAY vendor in QVL list.
             So Foxconn need ALT's designation of this IR sensor.
             Foxconn will provide data sheet on mantis
         ALT will discuss internally and feedback soon.
    e. FFC Cable
             Foxconn will discuss about thickness of copper foil with FFC cable vendor today.
             Foxconn ask Vendor to meet thickness requirement from connector vendor.
         Connector vendor's feedback will provide 12/28.
2. Factory
    a. Void issue
             Foxconn factory will do control run with new soldering paste on 12/28.
             The result of control run can be delivered by the end of next week.
3. DFM
    a. New housing will be arrived today.
             Foxconn factory will provide the schedule of control run of new housing.
    b. Item 33
         ALT keep asking to remove Side LED boss removal after 13K.
             INKEL is reviewing it.
             ALT will update when INKEL makes a decision.
    c. Item 17
         INKEL is waiting for their package sample.
         If they receive it by this week, then they will start environmental test next week.
         ALT think that Foxconn can use new package from 1/10 in China factory.
             ALT will update when ALT get some update.
    d. Item 19
             INKEL will send new eva gasket component to VN today. If there is no logistics issue, then it will provide from Jan.
4. Eagle :
    a. RMA
             ALT sent test trial for RMA 1 package to HK yesterday.
             Foxconn factory PM will handle from HK to VN
    b. 2nd source Introduction
         Foxconn will have control run for 2nd source 3 step.
        1st control run - Rest IC change
        2nd control run - ethernet PHY change
        3rd control run - BT change
         Foxconn and ALT assign 80 pcs that use 2nd source components.
             ALT will inform how many samples that ALT need early of next week.

Best regards,
SuhYoung YOON

(PM) Carey Lu

2021-12-27 16:24

no access   ~0009147

Hi Mr. Yoon,

Need your help to check if you can have feedback for below items before tomorrow? Thank you!

1) Electronic capacitor, Foxconn asked ALT to check that ALT can provide Samyoung E-Cap as B/S material. ALT will discuss internally.
2) Swan 2nd source 1st sample build 8 pcs, Foxconn asked ALT to pay delivery cost. ALT will discuss with Biz team and feedback soon.
3) Eagle 2nd source ( 1st control run - Rest IC change) sample Qty for ALT

Best Regards,
Carey Lu

(ALTech) SY Yoon

2021-12-28 16:32

developer   ~0009148

Last edited: 2021-12-29 16:52

Hi Ms. Carey Lu,

1. We are checking the cost of E-CAP now.
    We think we can do it, so we are concerning about cost and LT now.
    Our biz team will contact your biz team on it.
2. We accepted we will pay delivery cost.
3. We don't need any sample for eagle that use new RESET IC.
     So we need 40 pcs for each samples that use new e-PHY and BT.
     But we need 4 more pcs for samples that use new BT for KC.

Best Regards,
SuhYoung YOON

(PM) Carey Lu

2021-12-29 11:12

no access   ~0009160

Hi Mr. Yoon,

Thanks for your feedback.
Please help to provide Fedex account and recipient information for Swan 2nd source 1st sample build-8 pcs sample.

Best Regards,
Carey Lu

(ALTech) SY Yoon

2021-12-29 16:03

developer   ~0009167

Hi Ms. Carey Lu,

1. FedEx account# 852851333

2. Recipient Information.
     Mr. Lonnie KIM
     Phone number : +82-10-2046-6084
     Address :
                 ALT CO., LTD.
                 4F, SHINHWA BLDG, 17,
                 HANNAM-DA-21-GIL, YONGSAN-GU
                 SEOUL-SI YONGSAN-GU KR 04390

Best Regards,
SuhYoung YOON

(ALTech) SY Yoon

2021-12-30 15:14

developer   ~0009176

Hi All,

I update about meeting minute last week as follows.

1. HW
    a. Acoustic testing(911)
            Foxconn can provide acoustic chamber test result for 100 pcs by the end next week.
         => Foxconn provide ECO control run on mantis 0001359.
                  There is an test issue on woofer balance. We will review it by next week.
    b. Audio Noise issue
             Foxconn factory will finish control run for ECO by today(12/24)
              If there is any issue, then ECO will apply from next Monday(12/27)
              Foxconn will provide result of control run by today.
              => Foxconn provide ECO control run on mantis 0001359.
                   Foxconn factory still have 578 pcs semi-FG that produced before.
                   So Foxconn factory will apply ECO from next MP, it will be the after 1/10 of 2022.
    c. 2nd Source
            Electronic capacitor
                   Foxconn asked ALT to check that ALT can provide Samyoung E-Cap as B/S material.
                   ALT will discuss internally.
                   => Our biz team will contact to your biz team on cost and LT on Samyoung E-Cap soon.
          1st Build
                   Foxconn started 1st build in this week, but it will finish by 12/28.
               Foxconn can send samples the early of next year.
               Foxconn asked ALT to pay delivery cost. ALT will discuss with Biz team and feedback soon.
                   => Foxconn will provide 8 sample units(2 for non-secured, 6 for secured)
                        And ALT will pay delivery cost for samples. ALT provided Fedex account and recipient information.(1392)
    d. Designated Parts
             Foxconn asked ALT to send an e-mail to designate IR sensor.
             Foxconn purchasing team delete VISHAY vendor in QVL list.
             So Foxconn need ALT's designation of this IR sensor.
             Foxconn will provide data sheet on mantis
           ALT will discuss internally and feedback soon.
         => Mr. Steve Lee provided part designation letter on 12/28.
    e. FFC Cable
            Foxconn will discuss about thickness of copper foil with FFC cable vendor today.
            Foxconn ask Vendor to meet thickness requirement from connector vendor.
           Connector vendor's feedback will provide 12/28.
            => ALT is waiting for FII feedback about thickness of copper foil from FFC cable vendor.
                 And we are reviewing the result of Connector vendor.
2. Factory
    a. Void issue
            Foxconn factory will do control run with new soldering paste on 12/28.
            The result of control run can be delivered by the end of next week.
         => ALT is waiting for feedback of VN Factory.
3. DFM
    a. New housing will be arrived today.
            Foxconn factory will provide the schedule of control run of new housing.
            => INKEL and Foxconn Factory discussed it. And it will start control run
                 for new button ass'y early of next week.
    b. Item 33
        ALT keep asking to remove Side LED boss removal after 13K.
            INKEL is reviewing it.
            ALT will update when INKEL makes a decision.
            => INKEL will provide Top housing without side LED boss rib from Jan.
    c. Item 17
               INKEL is waiting for their package sample.
        If they receive it by this week, then they will start environmental test next week.
        ALT think that Foxconn can use new package from 1/10 in China factory.
            ALT will update when ALT get some update.
        => INKEL will provide new package to us 12/30. INKEL will test and feedback their result by 1/7.
                  INKEL will order new package for MP and it will apply from 1/20 from VN.
    d. Item 19
            INKEL will send new eva gasket component to VN today. If there is no logistics issue, then it will provide from Jan.
            => New component has been arrived in VN factory. INKEL will apply it from Jan. delivery.
4. Eagle :
    a. RMA
            ALT sent test trial for RMA 1 package to HK yesterday.
            Foxconn factory PM will handle from HK to VN
        => RMA Package arrived in HK 12/30.
    b. 2nd source Introduction
        Foxconn will have control run for 2nd source 3 step.
        1st control run - Rest IC change
        2nd control run - ethernet PHY change
        3rd control run - BT change
        Foxconn and ALT assign 80 pcs that use 2nd source components.
            ALT will inform how many samples that ALT need early of next week.
        => ALT informed q'ty of samples for each control run.
                  - 41 pcs for 2nd control run. 1 unit is for EMI SCAN.
                  - 44 pcs for 3rd control run. 4 units are for KC certification.

Best Regards,
SuhYoung YOON

(PM) Carey Lu

2021-12-30 18:01

no access   ~0009183

Hi Mr.Yoon,

Please see attached for the tracking list update.
The meeting tomorrow will be cancelled as it's national holiday in TW. (Next meeting will be held on Jan 7th.)
Kindly let us know if you have any questions. Thank you!

Best Regards,
Carey Lu

(PM) Carey Lu

2022-01-03 12:14

no access   ~0009190

Hi Mr.Yoon,

For Swan 2nd source introduction throughput issue, can you help to confirm this ASAP? The production line is on hold now for further instruction for this issue.
Thank you.

Best Regards,
Carey Lu

(PM) Carey Lu

2022-01-06 17:40

no access   ~0009289

Hi Mr. Yoon,

Please refer to attached file for the meeting tomorrow. Thank you.

Best Regards,
Carey Lu

(ALTech) SY Yoon

2022-01-10 18:59

developer   ~0009314

Hi All,

I update about meeting minute last week as follows.

1. HW
    a. Acoustic testing(911)
            After using 2 sec wave file for 400Hz woofer balance test, the test result is stable.
        => [ALT] ALT will ask summarize of Acoustic chamber test what we need more information.
    b. FFC Cable
            Foxconn prefer to use solution 2 due to adhesive risk.
        Hirose Japan had vacation last week, so they will feedback next week.
            FII will start to discuss with Hirose Taiwan today.
            => ALT asked Foxconn to check it with Connector vendor.
                 ALT prefer to use Connector vendor's choice.
                 ALT asked FII to add ALT members on e-mail communication between FII and Hirose Japan.
    c. 2nd Source
            Sample Build
        1/6 test complete
        1/7 will send sample to Taiwan RD.
        1/10 ~ 1/11 FII will receive new sample.
        1/12 FII will send sample to Synaptics CN. Foxconn VN cannot send sample to Synaptics CN.
        0000024:0000001/17 Synaptics CN will get new sample
        0000024:0000001/21 Synaptics provide SW patch for new DC DC Converter.
        After that FII can start control run. So Foxconn thinks that the schedule may delayed.
        => Foxconn will provide sample build schedule and control run etc.
    d. ALT asked Foxconn to add Broken FFC cable issue on tracking list.
    e. DFM
        Button ass'y
        Foxconn will do control run with "hole size enlarge". They will provide result to ALT by 1/7.
        Foxconn will do control run with new ass'y method from 1/11.
        Removal Side LED Boss Rib
        Inkel rework from Jan. delivery
        Apply Bubble bag
        INKEL tested bubble bag in environmental test condition.
        But there are some mark on the housing.
        So ALT is discussing with INKEL for use of limited condition,
        such as delivery for INKEL VN to Foxconn VN only.
        Add eva gasket on side LED Boss to reduce the gap between bottom cover and the side deco.
        Inkel will add from Jan. delivery
2. Factory
    a. Void issue
        Foxconn will use Foxconn optimization setting, such as reflow rate, solder paste and stencil.
            ALT asked to have control run with Foxconn optimization setting and new stencil.
        ALT wants to know what is the next step to resolve void issue.
            Foxconn will check with expert on it and come back soon.
3. Eagle :
    a. RMA
            Foxconn will update RMA status after checking it with Foxconn VN.
    b. 2nd source Introduction
        Reset IC change - FII will do control run on 1/8.
        Eth PHY change - FII will sample build on 1/8.
                                           It will be do separate with Reset IC change control run.
                                   FII will inform when they can start control run.
                                   ALT asked 3 samples from sample build for EMI Scan.
                                           And ALT asked 38 samples from control run for SKB and ALT use included BMT/QA.
        BT change - FII will do sample build. In this sample build use realtek Eth-PHY instead of Motorcomm.
                          ALT asked to provide 1 sample from sample build.
                                  And ALT asked 43 samples from control run.

Best Regards,
SuhYoung YOON

(PM) Carey Lu

2022-01-13 17:16

no access   ~0009347

HI Mr. Yoon,

Please see attached for the tracking list of meeting tomorrow.
Thanks.

Best Regards,
Carey Lu

(PM) Carey Lu

2022-01-13 17:17

no access  

(ALTech) SY Yoon

2022-01-14 16:44

developer   ~0009350

Hi All,

I update about meeting minute last week as follows.
1. HW
    a. Acoustic testing(911)
            Foxconn will collect MP data from next MP.
            Current plan for next MP is SMT from 1/17 and Sub B'd SMT from 1/19
            Foxconn will provide data after next MP.
    b. FFC Cable
            Foxconn is waiting for feedback from Hirose JP now.
            Hirose JP doesn't have experience on FFC cable, so they are discussing with Cable vendor in Japan now.
            ALT asked Foxconn to push Hirose for their feedback on FFC cable improvement options.
        ALT asked Foxconn that Foxconn arrange to discuss Hirose with FFC cable vendor in TW, not JP.
            FFC Cable vendor is preparing 2 new FFC Cable, but vendor will provide another sample with free of charge
            when Hirose suggests another structure or material for new FFC Cable.
    c. 2nd Source
            Sample Build
        1/13 Sample ETA in TW
        1/14 Foxconn will send a sample to Synaptics CN.
         Foxconn will provide 2nd source sample unit to ALT until 2/11.
    d. Broken FFC Cable
        1/13 Foxconn sent 2 defected samples to CN.
                 Foxconn expect to get vendor's analysis by next week.
        Foxconn think that vendor should find the exact broken position of cable first.
        ALT asked Foxconn to provide below test result.
            Test report that cable folding-unfolding repeatedly.
2. Factory
    a. Void issue
         Foxconn have 2 tests to reduce void issue.
        Option 1 Combination : Foxconn optimized profile, old soldering paste, Stencil thickness(0.1mm)
            Foxconn already did control run with Option 1 combination on 1/13.
                        Foxconn will check when they can provide test result.
        Option 2 Combination : Foxconn optimized profile, new soldering paste, Stencil thickness(0.09mm)
            Foxconn will plan new control run on option 2 combination. They will inform when they fix the plan.
3. Eagle
    a. EPD
        Foxconn will provide the process to get approval to visit Foxconn VN factory for EPD audit.
    b. 2nd source
        Reset IC
        Foxconn had some PCBA related issue for MP. So control run is delayed.
                Control run for new reset IC will start 1/20.
    e-Phy
        Sample will be sent to TW on 1/14.
        Foxconn TW will review the samples. After HW review of samples, Foxconn will send 3 samples to ALT.
    BT
        Foxconn can build 15 samples only. So Foxconn cannot provide it to ALT.
                ALT will receive all samples after control run, not sample build.
4. DFM
    Button ass'y
        Foxconn will provide Control run by 1/18
    Bubble bag
        INKEL find new bubble bag with different material.
        INKEL will test it by 1/27.
        INKEL will test Protection bag that use for final product for SWAN.

Best Regards,
SuhYoung YOON

(PM) Carey Lu

2022-01-20 19:15

no access  

(PM) Carey Lu

2022-01-20 19:15

no access   ~0009359

HI Mr.Yoon,

Please refer to attached file for the tracking list update. Thank you.

(ALTech) SY Yoon

2022-01-21 19:16

developer   ~0009363

Hi Ms. Carey Lu,

I summarized today's meeting minute.
If there is any misunderstandings, please let us know.

1. HW
    a. Acoustic testing(911)
            Foxconn will provide test result by next week.
        ALT asked acoustic chamber test SW.
            Foxconn will provide Lab view file of acoustic chamber test.
        Foxconn factory can provide it by 1/27.
    b. FFC Cable
            2 kinds FFC Cable samples will be delivered from 2/10 from vendor.
        Vendor will send samples to Foxconn factory in VN.
            Foxconn factory will do reliability test include burning test. It will take about a week.
            ALT asked to provide vendor's reliability test result, and Foxconn will ask to Vendor.
            ALT asked HALT Test result too. Foxconn will ask vendor about HALT test.
            And Foxconn will provide which test items vendor will test for their reliability and HALT test.
    c. 2nd Source
            Sample Build
        Foxconn already provide PCBA to Synaptics. Foxconn expect that it will be arrive by today.
        This schedule is delayed about a week. So Foxconn will push Synaptics to provide new driver for new component.
        Foxconn Factory will provide 8 samples to ALT by 1/25.
        On LED Driver tuning :
            New LED driver has different brightness adjustment type.
            New Awnic has linear type but TI has exponential type
            Foxconn will check the difference of Color of LED based on its current.
            But ALT asked Foxconn to check the color with color measurement equipment, not current.
            Foxconn will check it.
            Foxconn will provide their first tune value after color and brightness tune.
            ALT will check it with new samples but it is not enough to explain to SKB.
            The best way to explain about color difference between each LED Driver is to use test result
            of color measurement, not current.
    d. Broken FFC Cable
        Foxconn will receive Chinese version by 1/21. And Foxconn will provide English version by 1/26.
2. Factory
    a. Void issue
           Foxconn will do new control run on 1/25. Its combination is as follows :
         new solder paste + 0.1mm stenceil + Fii optimized profile
         But ALT think that it is not good to investigate the root cause of void and solder ball issue.
         So ALT asked Foxconn to review the FII optimized profile(reflow time and temperature).
          Foxconn will wechat group and discuss about it include ALT.Eagle
3. Eagle
    a. 2nd source
           Reset IC
        Foxconn will control run 1/25. Its reliability test will be provided after CNY.
        e-Phy
        Foxconn RD are investigating new e-phy chip now.
                There is no issue now. Foxconn is testing long aging test with CRC and EMI etc.
        The test result can be provide form next week.
        Foxconn will provide 3 samples to ALT after their test.
        BT
        Sample build will be started from 1/22 due to PCB delay.
4. DFM
    Bubble bag
        INKEL changed their plan to test due to sample delivery issue.
                INKEL will test 2/7 ~ 2/10. And INKEL can provide test report by 2/11.
    Rework
        Foxconn found Top cases without side LED rib cutting in INKEL's Jan. delivery.
        And Foxconn also found Bottom case Boss without "C-type" gasket.
        Foxconn asked ALT to check it with INKEL.
        ALT asked to INKEL about it, and complain why those issue happen in VN Factory.
        ALT is waiting for INKEL's feedback.
5. Etc.
    CNY Holidays
    ALT : 1/28 ~ 2/2
        Foxconn TW and VN : 1/29 ~ 2/6
    Weekly meeting
    1/28, 2/4 - Skip
    1/26 - Foxconn will provide weekly update.
    1/27 - Foxconn and ALT will discuss about any issues of weekly update

Best Regards,
SuhYoung YOON

(PM) Carey Lu

2022-01-26 17:54

no access  

(PM) Carey Lu

2022-01-26 17:54

no access   ~0009380

Hi Mr.Yoon,

Please see attached for the tracking list update, thanks.

BR,
Carey Lu

(ALTech) SY Yoon

2022-01-27 13:20

developer   ~0009385

Hi Ms. Carey Lu and Mr. Sean Chiang,

We reviewed your weekly tracking list.
I commented additional requests as follow :

1. HW & ME
    - FFC cable and connector defected sample
             We asked HALT Test result last weekly meeting. So please check with your vendor
             about HALT test condition and let me know.
    - 2nd Source
             PMIC change from SY8824 or HL7593
                    Synaptics and Foxconn seems to be worked together.
                    As you know, we should have a SW that can support both SY8824 and HL7593 at the same time.
2. Factory
    - Void issue
             We are very embarrassed on your DOA on 1/25.
             We asked you not to have additional control run last weekly meeting.
             And as you know, we already have wechat group to discuss on this issue.
             But you do control run without any discussion on the condition for control run.
             We are strongly ask you to discuss the next step and condition for next control run.
    - Golden sample
              We got golden samples early of this week. But it is not enough for golden sample.
               Some components are missing.
               We asked INKEL to provide another samples. They will prepare and send it on 2/9.
               So we may send Golden samples the 4th week of Feb.(by 2/25)
               But it depends on logistics status.
3. Eagle
    - RMA
                Please provide repair details for each STB before return it to Korea.
                And please test all repaired STB following your factory test procedure.
    - 2nd Source
                Please update Eth-PHY validation status on mantis.

Best Regards,
SuhYoung YOON

(HW) Sean Chiang

2022-02-07 19:31

developer   ~0009401

Hi Mr.Yoon,

Please see my feedback as below, Thanks.

1. HW & ME
    - FFC cable and connector defected sample
             We asked HALT Test result last weekly meeting. So please check with your vendor
             about HALT test condition and let me know.
==> Sean: We are checking with supplier about the HALT test and will get back to ALT if there is any questions this week.

    - 2nd Source
             PMIC change from SY8824 or HL7593
                    Synaptics and Foxconn seems to be worked together.
                    As you know, we should have a SW that can support both SY8824 and HL7593 at the same time.
==> Sean: We understand that, and we are still working with Synaptics to prepare the S/W. Currently, there are still some problems on the volatge cotrol between HL7593 & VS-550, and we are pushing Synaptics to speed up the tuning. Will keep you posted if there is any progress.

2. Factory
    - Void issue
             We are very embarrassed on your DOA on 1/25.
             We asked you not to have additional control run last weekly meeting.
             And as you know, we already have wechat group to discuss on this issue.
             But you do control run without any discussion on the condition for control run.
             We are strongly ask you to discuss the next step and condition for next control run.
==> Sean: Sorry, I have the same thought wiith you. We understand your request in previous meeting and have asked the factory to follow ALT's request before a control run. But we still received DOA result without any notification from factory. I've raised this problem with factory supervisor and asked them to follow our instructions before the next DOA.


Regards,
Sean

(HW) Sean Chiang

2022-02-10 19:59

developer  

(HW) Sean Chiang

2022-02-10 19:59

developer   ~0009431

Hi Mr.Yoon,

Pls see attached file for tomorrow's meeting. Thanks!


Regards,
Sean

(ALTech) SY Yoon

2022-02-11 17:16

developer   ~0009439

Hi Ms. Sheila Tu and Mr. Sean Chiang,

I summarized today's meeting minute.
If there is any misunderstandings, please let us know.

1. HW
    a. Acoustic testing(911)
            Foxconn will provide Manufacturing data by today.
    b. FFC Cable
            Vendor will ship out on 2/16.
        Vendor will provide reliability test plan by today.
          ALT will review the test items for reliability test and inform whether ALT has additional test items.
        Vendor and Foxconn didn't have test condition for HALT.
        ALT will discuss of internally and feedback to Foxconn next week.
    c. 2nd Source
            Sample Build
        HL7593WL08
            Synaptics provided patch for SWAN.
                        Foxconn already tested it and there is no issue.
            ALT asked to additional tests.
                Ripple, Transient response time etc based on dynamic load condition.
            Foxconn will do test it.
        Awinic LED Driver
            Foxconn will test LED color with Awinic LED driver in LED Vendor.
            Foxconn will provide test result by today. - Foxconn provided it today.
        Motorcomm Gbit Ethernet PHY
            Foxconn will do SI Test today. Foxconn will provide test result next week.
        New HW Schematic diagram.
            Foxconn will provide the latest Schematic diagram for 2nd source HW by today.
        EMI Test
            Foxconn tested EMI yesterday. Foxconn will update EMI Scan result on Mantis.
        => Foxconn will provide all test result by early of next week.
    d. Broken FFC Cable
        Foxconn factory provided factory review about broken FFC cable today.
        But ALT think that Foxconn factory review result is based on incorrect location of broken FFC Cable.
        The broken location is around Golden fingers, not copper shield area.
        Foxconn will discuss about it with Factory and then Foxconn makes and provides some review report to ALT.
        
2. Factory
    a. Void issue
        Foxconn factory has some suggestion about void issue.
        ALT asked Foxconn to use wechat group to discuss how to improve void issue.

3. Eagle
    a. RMA
        Foxconn will inform as follow
        - Rework report. It should be reported before RMA samples ship out.
        - When Foxconn factory will ship out RMA rework samples
    b. 2nd source
         e-Phy
        ALT asked to check Foxconn can provide 3 samples after Foxconn reliability test.
        Foxconn will check it.
         BT
        ALT asked to update BT development status.
                Foxconn is implementing BT function now. It delayed about a week.
            => ALT asked Foxconn to update 2nd source schedule and sample delivery.
    
4. DFM
    Change Button assembly owner.
        Foxconn factory already informed the MOH to Foxconn biz part.
        Foxconn biz part will review and discuss about it with ALT biz part.
        Foxconn factory will assign PN for button components.
        After biz discussion, it can be applied for MP.
        
5. Etc
    Foxconn RD PM changed from Ms. Carey Lu to Ms. Sheila Tu.

Best Regards,
SuhYoung YOON

(ALTech) Lonnie Kim

2022-02-16 08:04

developer  

(ALTech) Lonnie Kim

2022-02-16 08:04

developer   ~0009449

Hi, Sean

Please refer to attached FFC cable acceration test condition.

Best regards

Lonnie Kim

(HW) Sean Chiang

2022-02-17 20:07

developer   ~0009470

Hi Mr.Yoon,

Pls find attached file for tomorrow's meeting. Thanks!


Regards,
Sean

(ALTech) SY Yoon

2022-02-18 16:03

developer   ~0009475

Hi Ms. Sheila Tu and Mr. Sean Chiang,

I summarized today's meeting minute.
If there is any misunderstandings, please let us know.

1. HW
    a. Acoustic testing(911)
            Foxconn need time to collect data from vendor.
        => ALT asked to make a plan when data will be collected and update on Mantis.
    b. FFC Cable
             HALT Test
        Foxconn is trying to check whether Foxconn factory can test HALT test in VN.
                Because ALT asked to use 10 samples for test.
        If Foxconn factory cannot test it, then Foxconn will check below option.
            Option 1 : Test in 3rd party Lab. In VN.
                        Option 2 : Test in TW or Vendor's Lab. In CN.
        Foxconn will update their status on Mantis.
         Reliability test
        Foxconn provide sample reliability test report on Mantis.
                Foxconn think that its reliability test items are normal test condition as a standard.
         So Foxconn thinks that it is acceptable.
        ALT misunderstood that it is test report.
        ALT will review and update ALT's review opinion on Mantis by today.
    c. 2nd Source
            Sample Build
        HL7593WL08
            Foxconn provide test result on Mantis.
                        ALT will review it.
            ALT has some noise issue when ALT test FFV(NUGU) function.
                        ALT thinks that it looks CPU performance issue that ALT met before.
            But ALT found that AMP B'd ECO doesn't apply on 2nd source B'd.
            ALT informed to Foxconn about ECO. And ALT will test again with ECO.
            ALT also asked to Foxconn to apply ECO for all 2nd source B'ds and test it.
        Awinic LED Driver
            ALT can accept that LED Color based on CIE test report.
                        ALT can accept that LED animation action with new LED driver.
        Motorcomm Gbit Ethernet PHY
            Foxconn will provide test report by today.
        EMI Test
            Foxconn tested EMI with all 2nd source components.
        => Foxconn need ALT's feedback of 2nd source sample for next step(PCB order for sample build).
             ALT will check NUGU operation on Monday and feedback to Foxconn.
        HW Validation test for Eth Phy and LED Driver
        Eth Phy : Foxconn use 4K contents playback and iperf test
        LED Driver : ALT asked to test as following condition
            LED Brightness : Keep the brightness during the test.
            Color : LED color change every 1 sec. for 72Hr.
                                     SWAN uses 13 colors for NUGU and status indication.
                                     [NUGU : blue, Green, Orange,
                                      Status : Blue, Green, Red, White
                          Side - Cyan, Orange, Pink, White(it use 2 different colors), yellow]
                              Foxconn will check with SW team and feedback to ALT.
    d. Broken FFC Cable
        Foxconn factory will provide 8D report
    e. FFC Bunt
        Foxconn think that it is not FFC cable and common mode filter.
                This issue looks PCB related issue.
        So Foxconn provide PCB to PCB vendor and ask investigate it.
        Foxconn will provide RD Analysis report to ALT today.
        Foxconn will provide vendor's Defect sample analysis report when Foxconn receive it.
        It is very critical and urgent issue, so ALT asked Foxconn to push PCB vendor to review defect sample.
                Foxconn need defected adaptor to review this issue.
        But ALT inform that it is very difficult to explain to SKB. This issue itself looks very serious.
                So it may make some misunderstand to SKB. But anyway ALT will try to check whether SKB can provide adaptor to ALT.

2. Eagle
    a. RMA
           Foxconn factory didn't start repair for RMA samples.
        Foxconn Factory can make a plan by 2/24 and let ALT knows.
        ALT complained about the sharing the status of RMA process.
        ALT received status of RMA process in this week as follows
        2/21 Foxconn will finish rework
    b. 2nd source
        Due to material shortage, Foxconn cannot meet sample build schedule for e-Phy.
        And Foxconn RD has delay on BT development.
            ALT asked Foxconn to update 2nd source schedule.


Best Regards,
SuhYoung YOON

(HW) Sean Chiang

2022-02-24 17:28

developer   ~0009504

Hi Mr.Yoon,

Update weekly report as attachment.


Regards,
Sean

(ALTech) SY Yoon

2022-02-25 16:17

developer   ~0009510

Hi Ms. Sheila Tu and Mr. Sean Chiang,

I summarized today's meeting minute.
If there is any misunderstandings, please let us know.

1. HW
    a. Acoustic testing(911)
            2nd Acoustic test chamber data will be received by today.
        Vendor contact point information will be provided by today
        Test Video clip will be provided today by Foxconn.
            Test SW And License
                     Foxconn will check the quotation about Test SW and its license and feedback soon
    b. FFC Cable
             Foxconn Factory received 2 kinds of sample on Feb. 21.
             Foxconn Factory cannot conduct reliability test because required test condition is beyond of chamber specification,
             especially temperature limitation. And Foxconn factory cannot visit 3rd party to test it due to COVID-19.
             And Foxconn QA should attend reliability and HALT test.
             So Reliability test and HALT test should be tested in Taiwan.
             Due to payment of test, Foxconn cannot conduct to Foxconn TW Lab..
              Foxconn is discussing with Vendor where they can conduct reliability and HALT test.
         Foxconn will update the test site when it is decided.
         Sample build
          Foxconn will rework after SWAN 2nd source sample build.
          -> ALT asked below questions.
            - How many samples Foxconn will use for reliability test with 2nd source sample ?
            - How many samples Foxconn will use for each new FFC cable ?
                           Foxconn : 5 pcs for each FFC cable.
            - Will Foxconn test reliability test for new cable and 2nd source separately ?
          -> FII will discuss internally and feedback to ALT soon.
         Kapton Tape data sheet is not enough. Foxconn will check it with vendor and update it.
    c. 2nd Source
             ALT asked to apply ECO for Sample Build.
           ALT think we don't divide non-p2p / p2p 2nd source.
         Foxconn will conduct sample build at once(for both non-p2p and p2p).
             So ALT asked to remove "non-p2p" in front of 2nd source build. It may make some confusion.
         Foxconn asked to update noise issue to Foxconn SW part. And ALT will update it on mantis.
            ALT asked 2nd source build milestone(Gantt chart type).
    d. Broken FFC Cable
         Tracking list update is incorrect. It is update for new FFC cable.
         It about new FFC cable that improve GND short due to connector.
         For Broken FFC cable,
            ALT will leave comment on mantis after review on 8D report from Foxconn factory.
    e. PCB Burned
        Vendor, VGT CN will analyze it.
        ALT think that Factory can detect if it is PCB issue.
        Foxconn will discuss with Factory QA more, and feedback to ALT.
        Common mode filter Vendor tested with high current in component based.
        ALT asked Foxconn to reproduce this issue with contact FFC cable shield part and coil part of common mode filter.
            Foxconn will discuss with their QA.

2. Eagle
    a. RMA
        Foxconn factory will send RMA samples to Korea today.
        And Foxconn will provide FA report by 2/28
    b. 2nd source
        BT Part - SW development needs 2~3 weeks more.
                   HW part didn't finish verification test yet, but Foxconn will conduct circuit design
                   and HW verification test at the same time. So Foxconn can keep the schedule in HW side.
               ALT asked to update SW status on tracking list from next weekly meeting.
            Foxconn cannot provide any sample that use new BT module. Foxconn will provide samples after sample run.

Best regards,
SuhYoung YOON

(PM) Sheila Tu

2022-03-04 17:45

developer   ~0009547

Update meeting slides for 220307 meeting.

(PM) Dennis Lu

2022-03-07 11:05

developer   ~0009551

Update schedule for SWAN non pin to pin and Eagle (MotorComm)

(ALTech) SY Yoon

2022-03-07 20:08

developer   ~0009565

Hi Ms. Sheila Tu and Mr. Sean Chiang,

I summarized today's meeting minute.
If there is any misunderstandings, please let us know.

1. HW
    a. Acoustic testing(911)
            Background noise test spec.
        Vendor tested acoustic Chamber at China Factory.
        Foxconn asked to test more wide Frequency range after 1st chamber delivery.
        Vendor changed test spec. based on FII's request.
        So 2nd acoustic chamber background noise test result was not same freq. range.
        SW License
        Vendor provide 2nd Chamber without License.
        FII will check it with biz team about quotation.
        After check it, FII will update about it.
    b. FFC Cable
            HALT Test
        ALT confuse about HALT test items.
        So Foxconn will list each HALT test item and mark the items that Foxconn may skip.
        ALT will review it and feedback to FII.
        Test fee
        Foxconn ties to reduce test items not to pay for the test.
        Foxconn HW QA test doesn't need to pay.
        Tensile Strength issue
        ALT asked 33 lbs/in^2. But Vendor use 9.8 N/cm^2.
        Foxconn Factory received 2 kinds of sample on Feb. 21.
                So Foxconn will check with vendor why they didn't follow our recommendation.
        2 solutions for FFC cable.
        ALT doesn't care what kinds of solution Foxconn select.
        But it should be met test scenario 1 and 2.
        ALT asked to check whether kepton tape is pierced or not after the test.
        Foxconn understand ALT's concern and will discuss with vendor and inform to ALT.
    c. 2nd Source
            Foxconn will not test EMI/EMC with samples that will manufacture during sample build.
         Foxconn already tested it with sample for development. New ethernet PHY was applied.
        ALT concerned that there is not much margin when KC applied before.
    d. Broken FFC Cable
        Foxconn will update FA report by 3/9.
    e. PCB Burned
        PCB Vendor will provide x-section report by today.
        Foxconn will ask to make it in English.
            ALT asked to provide their report even though they can provide only Chinese version.
        Foxconn will provide 8D report based on Vendor's report.

2. Factory
    a. Void issue
        ALT asked to inform what Foxconn factory's suggestion is.
3. Eagle
    a. RMA
        Foxconn factory provided RMA report by today.
            ALT will give feedback after review it.
    b. 2nd source
        BT Part - SW development status.
        Foxconn has an issue with old RCU(BA01).
        Foxconn provide sample to AMLOGIC to check it.
        Foxconn HW and SW think that it is a SW related issue.
                So Foxconn will order PCB for sample build by the end of this week.


Best regards,
SuhYoung YOON

(PM) Sheila Tu

2022-03-10 22:03

developer   ~0009582

Update meeting slides for 220311 meeting.

(ALTech) SY Yoon

2022-03-11 17:05

developer   ~0009593

Hi Ms. Sheila Tu and Mr. Sean Chiang,

I summarized today's meeting minute.
If there is any misunderstandings, please let us know.

1. HW
    a. Acoustic testing(911)
            SW License
        ALT is waiting for the update on Test SW and its license.
                Foxconn will check with vendor about below items
            SW License - serial no.
            Test SW
    b. FFC Cable(1417)
            HALT Test
        Foxconn will ask quotation about HALT test to their 3rd Party Lab.
        Test Scenario 1 will be conducted by FII HWQA next week.
                Foxconn will inform exact schedule about test.
        Foxconn HW QA will handle both test scenario 1 and 2.
          Test fee
        Foxconn will ask FFC cable vendor to pay for HALT test fee
        Tensile Strength issue
        FFC cable vendor had mistake to check our requirement. So they didn't use Kepton tape that meet our requirement.
                But FFC Cable vendor said that their Kepton tape has the higher Tensile strength than its spec.
        Their vendor's test result show it.
                ALT ask Foxconn to check it.
                    1. If Vendor guarantees of its test result, then change Kepton tape specification and provide it again.
            2. Vendor can provide another sample that use new kepton tape that meet our requirement.
        Foxconn will check it with FFC cable vendor and will feedback to ALT.
        ALT asked Foxconn to follow test sequence as follows.
        HALT test DUTs use FFC cable that already tested HALT Test scenario 1.
                After both test scenario 1 and 2, to check whether Kepton tape is penetrated or not.
        Foxconn will check it with their HW QA Team.
    c. 2nd Source(1357/1392)
                Foxconn will send samples on 3/22(ETD).
            ALT will scan EMI/EMC with the samples that Foxconn already provide on 3/21.
    d. Broken FFC Cable(1373)
            Foxconn will provide FA report 3/14.
    e. PCB Burned(1428)
             PCB Vendor already provided x-section report in English.
             This report was prepared by Vendor's 3rd party Lab.
             Foxconn QA Team will work with their PCB vendor and make 8D report. It will be provide to ALT next week.
                   ALT asked Foxconn to include as follow
                 What is the root cause ?
                 How many samples may have same issue ?
                 Who has the responsibility for this issue ?
                 How should we handle this issue that will happen in the field later ?
2. Factory
    a. Void issue(1315)
            Foxconn will inform which profile is the preferable for Foxconn factory.
3. Eagle
    a. EPD(1180)
        SKB will not ask EPD Certification in this year.
            So ALT commented this situation on Mantis. ALT think we can close it.
    b. 2nd source(1353)
         E-PHY : control run started 3/10
                           Samples can be provided on 3/18(ETD)
          BT Part : Foxconn will gerber out today.
                            Foxconn has some HW changes on the latest HW design.
                             So Foxconn will share HW change list by today(3/11).
                 SW development status.
                     Foxconn provide HW sample to AML on 3/9
                             AML will receive it next week. AML will be update their progress next week.
                             ALT asked Ms. Sheila TU to add SW Status on weekly tracking list.

Best regards,
SuhYoung YOON

(HW) Sean Chiang

2022-03-17 20:03

developer   ~0009643

Hi Mr.Yoon,

Please refer to attached file for meeting tomorrow, thanks!


Regards,
Sean

(ALTech) SY Yoon

2022-03-18 16:08

developer   ~0009648

Hi Ms. Sheila Tu and Mr. Sean Chiang,

I summarized today's meeting minute.
If there is any misunderstandings, please let us know.

1. HW
    a. Acoustic testing(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=911)
            SW License
        Foxconn and vendor checked that PO included SW license.
                Vendor will provide license by the end of this month. Foxconn will update.
        Test SW
        It will be provided by today(3/18)
    b. FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1417)
        New Kepton tape
        Vendor will provide new sample that apply solution 2 only.
        Vendor will provide new sample that use enhanced tensile strength.
        Vendor will conduct reliable test with new sample
        Foxconn HW QA will handle HALT test in Taiwan(both Test scenario 1 and 2)
        Kepton tape datasheet
        Test standard in the datasheet is ASTM D3330.
        But ALT checked it and it was to test Peel adhesion of pressure-sensitive tape.
        So ALT think that it is the test standard for adhesion not tensile strength.
        ALT checked other test standard. Please check ASTM3759.
        It is test standard for "Tape Tensile Strenth + Elongation"
        Foxconn will check it with vendor about test standard.
        Schedule
        China is getting worse on COVID-19 shutdown.
        ALT worried about it.
        Foxconn will ask their vendor to make samples in advance.
        Vendor office is in Taiwan, but their factory is in Suzhou.
    c. 2nd source(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1357)
        Sample build is delayed due to PCB delivery delay.
         It will assemble on 3/25, so Foxconn can deliver it to ALT next next week.
    d. Broken FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1373)
             Foxconn provided 8D report
             But the corrective action was only SOP(assembly method) modification and OP training.
         ALT ask to improve FFC cable not to defect even though OP try to fold it.
             Foxconn will discuss about it.
         ALT accept Foxconn's corrective action as short term solution,
             But ALT asked to prepare long term solution, such as improvement of FFC cable.
         There are 2 version of FFC cables, shorter one and longer one.
             The golden finger area is same both shorter cable and longer one.
    e. PCB Burned(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1428)
         Foxconn will provide 8D report in this week.
         Vendor's corrective action(AOI, e test) will be added in the 8D report.
         Vendor didn't accept that the root cause is the residual copper in via area.
         Vendor ask Foxconn to check the short of choke and capacitor.
         Foxconn QA will review vendor's opinion.
         ALT ask Foxconn to check whether FFC shield part may can touch wire part of Choke.
         Foxconn will do check it.
         ALT asked Foxconn that 8D report should be include expected no. of defect STBs and who is in charge of it.
             But Foxconn need more discussion with vendor.
         ALT asked Foxconn to prepare short term solution for it.
         Foxconn will review possibility about root cause first.
2. Factory
    a. Void issue(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1315)
             Foxconn and ALT discuss about it on mantis.
3. Eagle
    a. 2nd source(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1353)
          E-PHY : Control run delayed. So Samples can be delivery by 3/23(ETD)
                      During the control run there are some issue.
                      Foxconn tuned again and made new firmware to fix it
                      Foxconn will do control run tomorrow with new SW.
          BT Part : Cypress status is getting worse.
                          Foxconn need another solution instead of Cypress.
                      But SKB didn't accept to use AMPAK.
                       SKB doesn't want to change BT. BT may cause big trouble in the field.
                      SKB's other vendor use realtek solution now.
                      Foxconn still have material shortage issue on BT realtek.
                          So currently the only solution is to use MOVON Module.
                      ALT will discuss to use MOVON Module again.
                  Foxconn doesn't have issue to use Movon except for purchasing.
                   It should be discussed in Biz meeting this afternoon.
                  Foxconn think that new BT chipset introduction need 3 ~ 4 month.
        Introduction 2nd source(component needs new SW)
           Change mass production SW version.
                SKB start normal OTA after their BMT. But they start
                OTA for small q'ty of STB at first and then they extend no. of STB for OTA.
                After almost all STB use the latest version of SW, then SKB want to change
                        mass production SW version. Normally it takes about 2 month after BMT.
                        If new SW increase VoC then they will stop OTA and wait new SW release.
                So we cannot expect exact duration from BMT to new SW use for MP.
           Foxconn asked ALT to provide below documents
            Module
                Data sheet
            Reference b'd.
                Schematic
                Layout file
            ALT will check it and feedback to you.
    b. RMA
        ALT is waiting for 1st RMA return now. But it keep delaying due to customs clearance.
            Foxconn will check the ETD with factory.

Best Regards,
SuhYoung YOON

(HW) Sean Chiang

2022-03-24 18:45

developer   ~0009698

Hi Mr.Yoon,

Please refer to attached file for the meeting tomorrow, thanks!


Regards,
Sean

(ALTech) SY Yoon

2022-03-25 15:34

developer   ~0009703

Hi Ms. Sheila Tu and Mr. Sean Chiang,

I summarized today's meeting minute.
If there is any misunderstandings, please let us know.

1. HW
    a. Acoustic testing(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=911)
            SW License
        Vendor will provide license by the end of this month. Foxconn will update.
        Test SW
        It already updated on mantis.
    b. FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1417)
        New Kepton tape
        Vendor will update test standard on data sheet.
        Foxconn guarantee that MXPI-310F and MXPI-310 is different component.
        ALT asked FII that there is any possibility to change vendor.
        But Foxconn cannot force to change kepton tape vendor to their cable vendor.
        New sample delivery schedule is not fixed yet due to kepton tape.
        Kepton tape vendor is located in Shenzhen.
        FII didn't know the status of city shutdown due to COVID-19.
            Foxconn will check it and update schedule.
    c. 2nd source(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1357)
        Sample will send to ALT by 3/28.
    d. Broken FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1373)
            ALT asked Foxconn to prepare long term solution.
        Foxconn ask their vendor to review it. But their think that the stiffener is made of PET and is a common material.
            Vendor didn't have another material for stiffener.
        ALT will review it with cable and connector and come back to you soon.
    e. PCB Burned(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1428)
        Foxconn provided 8D report on mantis.
        Title of document Foxconn provided was FA Report. But it is 8D report.
        Foxconn will update it contents and title.
        ALT asked Foxconn to provide FA report from PCB vendor. Foxconn will check their QA Team.
        ALT think that one of cause of this issue is short between FFC cable shield and Choke filter.
        The force below heat spreader push FFC Cable to choke filter. It may make defect on FFC cable sponge.
            So FFC cable shield part make short with Choke coil.
        ALT think we need short term solution to prevent short between FFC cable and choke filter.
        Foxconn think that they already inform it 1st review of this issue.
            That was training OP not to assemble FFC may inserted between Heat spreader and Choke filter.
        ALT asked Foxconn that ALT need more sure way to prevent it, such as addition insulation material top of Choke filter.
        Foxconn will discuss it with their vendor and come back soon.
        ALT also asked to add short term solution in 8D report.
2. Factory
    a. Void issue(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1315)
            Foxconn cannot provide 1000 pcs test result. It is too many.
        ALT asked Foxconn to provide 500 pcs test result, but Foxconn can make test result 100 pcs every production.
            So Foxconn will provide 500 pcs test data through 5 productions.
3. Eagle
    a. 2nd source(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1353)
        E-PHY : Foxconn will ship sample with new E-PHY by 3/25
                      But SKB didn't fix BMT schedule yet.
                  Once SKB fix their schedule, then we can provide it.
                      New E-PHY chip need new SW. So Foxconn can introduce new product
                  after SKB accept to use new SW for the production.
          BT Part : SKB accept to use MOVON BT Module.
            Foxconn asked to provide it by e-mail.
            ALT already sent some data for MOVON BT module,
                    include reference b'd schematic and layout.
    b. RMA
        ALT is waiting for 1st RMA return now. Foxconn factory sent it yesterday.
            Ms. Sheila Tu will check it and let ALT know about tracking no.
    c. LED issue
            ALT found 2 defect LED from acceptance test in SKB factory yesterday.
            If ALT provide its serial no to Foxconn factory, then Foxconn factory will review it.
        Foxconn factory will review on defect sample first.
        ALT would like to know that this LED is applied long term solution or short term solution.

Best Regards,
SuhYoung YOON

(HW) Sean Chiang

2022-03-31 19:10

developer   ~0009772

Hi Mr.Yoon,

Please refer to attached file for the meeting tomorrow, thanks!


Regards,
Sean

(ALTech) SY Yoon

2022-04-01 16:24

developer   ~0009784

Hi Ms. Sheila Tu and Mr. Sean Chiang,

I summarized today's meeting minute.
If there is any misunderstandings, please let us know.

1. HW
    a. Acoustic testing(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=911)
            SW License
        Vendor planned to order License mid of Mar.
                But due to the delay in the purchasing process, the order was placed at the end of Mar.
                Vendor expect the license will be provided by mid of April.
    b. FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1417)
         New Kepton tape
        ALT will review the data sheet and feedback to you soon.
    c. 2nd source(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1357)
        ALT check the shipment schedule now. ALT will inform when it fix.
    d. Broken FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1373)
            ALT is checking connector spec. now. We will comment about it on Mantis.
    e. PCB Burned(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1428)
        ALT accepted that Foxconn will test followed by ALT guide with 2nd source sample.
            ALT accepted to test with STB that play 450Hz tone on USB memory, not Youtube.
         ALT worry about the LCP material. It looks fragile material. Foxconn will get datasheet of new choke filter.
            ALT asked Foxconn to check the dimension of choke filter that has enough space when it assembled with SoC b'd.
            ALT asked Foxconn to conduct a vibration test before applying it.
    f. CS manual
             ALT and Foxconn signed SOW already. So Foxconn can start to prepare CS manual.
    g. BOM, schematic and layout diagram
        Foxconn send an e-mail about it.
            Foxconn needs ALT VP e-mail about it even though it already described on RFP.
            It should be provide Foxconn legal team. That is a rule of Foxconn group.
            ALT biz team will handle it.
2. Factory
    a. Void issue(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1315)
            Foxconn will conduct 250 pcs control run for 1000 mic x-ray pictures.
            ALT accepted it. ALT will review the pictures and request additional x-ray pictures if necessary.
3. Eagle
    a. 2nd source(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1353)
        E-PHY : Foxconn asked ALT to finish BMT by the end of April.
            Foxconn wants to use new component from May.
                    But SKB didn't have plan for BMT yet. Current their schedule will be June.
                    But Foxconn can use new component when SKB accept use the new SW for MP.
                    SKB will accept to use new SW if VoC does not increase after using new SW.
        BT Part : Foxconn is waiting for Biz feedback to use BT module from ALT Biz team.
                     ALT is checking on it with vendor and Foxconn now.

Best Regards,
SuhYoung YOON

(PM) Sheila Tu

2022-04-07 14:49

developer   ~0009836

Update meeting slides for 220408 meeting.

(ALTech) SY Yoon

2022-04-12 15:11

developer   ~0009875

Hi Ms. Sheila Tu and Mr. Sean Chiang,

I summarized today's meeting minute.
If there is any misunderstandings, please let us know.

1. HW
    a. Acoustic testing(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=911)
            SW License
        ALT will visit Foxconn VN Factory next month.
                And ALT will check the licenses for both acoustic chambers.
    b. FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1417)
           New Kepton tape spec.
        ALT doesn't care about detail spec. of Kepton tape.
                If there is no issue with Foxconn's reliability test and HALT test, then ALT can accept.
        But ALT asked Foxconn during the meeting
            - Foxconn should check whether connector pins make holes on kepton tape after HALT test.
                           The test report should be include it.
            - Foxconn should add some cautions to assemble FFC cable on SOP
                           to avoid damage on golden finger area.
               Foxconn will share new SOP to ALT.
    c. 2nd source(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1357)
         ALT asked Foxconn to update 2nd source reliability test plan and FFC cable test plan on mantis.
    d. Broken FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1373)
             ALT will check the 8D report and feedback on mantis if ALT has any question.
    e. PCB Burned(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1428)
          Foxconn is discussing on LCP material with vendor how it fragile for vibration.
             Foxconn is waiting for Vendor's feedback. It will updated once Foxconn get feedback.
    f. CS manual
             Foxconn factory CFE Team will make CS manual. ALT asked Foxconn to provide its plan.
    g. BOM, schematic and layout diagram
         ALT biz team sent e-mail already.
             Please update its status.
2. Factory
    a. Void issue(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1315)
            Foxconn will check that 1250 means total no. of product or MIC void pictures.
3. Eagle
    a. 2nd source(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1353)
        E-PHY :
        SKB is planning new SW release now. It will be next week.
                ALT is discussing with SKB to include new ethernet PHY SW.
                ALT will update its schedule once it fix.
        BT Part :
                ALT and Foxconn is discussing about new MOVON BT module.

Best Regards,
SuhYoung YOON

(HW) Sean Chiang

2022-04-14 16:33

developer  

(HW) Sean Chiang

2022-04-14 16:33

developer   ~0009887

Hi Mr.Yoon,

Please refer to the attached file for the tomorrow's meeting, thanks!


Regards,
Sean

(ALTech) SY Yoon

2022-04-15 14:41

developer   ~0009890

Hi Ms. Sheila Tu and Mr. Sean Chiang,

I summarized today's meeting minute.
If there is any misunderstandings, please let us know.

1. HW
    a. Acoustic testing(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=911)
            SW License
        Foxconn will activate New NI License in this week.
        After activate new NI license, Foxconn will capture it and provide ALT.
        ALT will visit Foxconn factory and check it. So Foxconn should activate it before ALT visit.
    b. FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1417)
        New Kepton tape spec.
        New sample schedule is not fix yet due to copper foil delivery.
                COVID-19 status in China is getting worse.
        Once it fix, then Foxconn will provide its schedule.
        Test cost is not fixed yet. Foxconn will check the test cost by next week.
              Foxconn keep attching kepton tape on FFC cable as short term solution.
    c. 2nd source(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1357)
        Foxconn will conduct reliability test 4/16 ~ 5/1. And Foxconn will report it by 5/4.
        Before BMT, ALT should provide test report to SKB. So it should not be delayed.
    d. Broken FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1373)
            There is only comment that operator should use hand only to assemble FFC cable in SOP.
        ALT asked to add some comments in SOP how to assemble FFC cable to avoid FFC broken issue.
    e. PCB Burned(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1428)
        Foxconn didn't receive any new choke filter sample yet.
            ALT asked to provide control run schedule.
            Foxconn doesn't have new choke filter issue due to COVID-19.
        Foxconn will provide LCP Material data sheet on mantis today.
    f. CS manual
            Foxconn will provide 1st version of CS manual today, but it may not include some assembly guide.
    
2. Factory
    a. Void issue(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1315)
             Foxconn will take pictures for 250 products and provide 1K Void pictures next week.
    b. Golden sample.
             ALT will provide pictures of golden samples by today. Foxconn asked it for customs clearance.
3. Eagle
    a. 2nd source(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1353)
        E-PHY :
        Foxconn will provide CRC and Auto negotiation test result by 4/19.
                SKB will start their QA/BMT from the end of next week. So it should not be delayed.
            => Foxconn should include same test items in SWAN 2nd source reliability test.
        BT Part :
                ALT and Foxconn biz team still keep discussing about to use new BT Module.

Best Regards,
SuhYoung YOON

(PM) Canon Hsieh

2022-04-21 17:55

developer   ~0009910

Dear All,
Please see that attachment for tomorrow meeting.

(ALTech) SY Yoon

2022-04-26 19:58

developer   ~0009937

Hi Ms. Sheila Tu and Mr. Sean Chiang,

I summarized last week's meeting minute.
If there is any misunderstandings, please let us know.

1. HW
    a. Acoustic testing(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=911)
            SW License
        Foxconn activated New NI License.
                ALT will check it during biz trip in Vietnam.
    b. FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1417)
        New sample using Kepton tape.
        COVID-19 in China is getting worse.
        Vendor has trouble to prepare material for new FFC cable, such as Copper foil and Kepton mylar.
        Foxconn keep tracking its schedule.
    c. 2nd source(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1357)
        Foxconn will provide reliability test report by 4/27 for 6 test items that will finish by 4/26.
        Foxconn will add CRC/Throughput/Auto-Nego(Gbit PHY) test schedule on reliability test schedule by 4/22.
    d. Broken FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1373)
            ALT ask Foxconn to check Method 1, but 3M tape should be attach top of Choke filter, not FFC Cable.
            Foxconn will check it internally and update soon.
    e. PCB Burned(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1428)
        New choke filter sample will receive by 4/25.
    f. CS manual
            Foxconn will provide 1st official version to review by 4/22.
    
2. Factory
    a. Void issue(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1315)
            Foxconn already conduct control run with new profile and collecting data now.
        Foxconn will provide report by next week.
    b. Golden sample.
            Foxconn will update the status of golden sample by today.
3. Eagle
    a. 2nd source(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1353)
        E-PHY :
        SKB will start their QA/BMT from next week.
        BT Part :
                No update this week.

Best Regards,
SuhYoung YOON

(PM) Canon Hsieh

2022-04-28 19:39

developer   ~0009947

Dear All,

Attachment is the file for tomorrow meeting.

Thanks

(ALTech) Lonnie Kim

2022-05-02 10:06

developer   ~0009952

Hi Sean and Canon

Your tracking item is wrong matched at your tracking items.
About "2021.10_first mass production two defected FFC cable" is FFC open issue not FFC malted issue item.
Please refer to Mantis 0001373 about FFC open issue(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1373)
And, my final comment is what your long-term solution about FFC open issue.
Please follow-up Mantis 0001373.

Best regards

Lonnie Kim
SWAN tracking list_220428.png (121,125 bytes)   
SWAN tracking list_220428.png (121,125 bytes)   

(ALTech) SY Yoon

2022-05-02 10:36

developer   ~0009953

Hi Mr. Canon. Hsieh and Mr. Sean Chiang,

I summarized last week's meeting minute.
If there is any misunderstandings, please let us know.

1. HW
    a. FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1417)
        New sample using Kepton tape.
        ETD 5/5, ETA 5/11
        ALT asked FII to provide brief schedule for QA Test and HALT Test schedule.
    b. 2nd source(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1357)
        ALT will leave comments after reviewing about the Reliability test report.
            Foxconn will finish all test include additional tests(CRC/Throughput/Auto-Nego(Gbit PHY)) by this week.
            Foxconn will provide test report by 5/4.
    c. PCB Burned(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1428)
        ALT asked Foxconn to check new proposal from ALT.
            ALT's proposal is to attach 3M tape on Choke coil, not FFC cable.
        Foxconn will review ALT's proposal, and feedback by 5/4.
         Mr. SH Son will check it with Foxconn Factory engineer when Mr. SH Son visit factory.
            New choke filter already arrived in Foxconn. ALT ask Foxconn to do drop test component base.
            Foxconn will check it to their vendor. Foxconn will conduct drop test product base normally.
            Foxconn can provide ALT with 2 ~ 3 choke filters. ALT will ask when it needed.
    e. CS manual
            Mr. SH Son provided some comment on CS Manual.
            Foxconn will check when they can provide update document.
    f. MP adaptor conduction issue(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1469)
        Foxconn had some issue on Adaptor during the test with 2nd source.
            ALT will check which adaptors are needed and will feedback to Foxconn.
    g. GPIO issue review(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1468)
        Foxconn asked ALT to provide 2 samples for Factory review.
        ALT will provide it when Mr. SH SON visit Factory next week.
    
2. Factory
    a. Golden sample.
            Foxconn just finished custom clearance.
            If there is any issue to discuss, then it can be discussed when Mr. SH Son visit Foxconn factory next week.
3. Eagle
    a. 2nd source(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1353)
        E-PHY :
        SKB asked new feature about OTA that new STB cannot update to SW that is not support new PHY.
                ALT asked Foxconn to check it.
    BT Part :
        No update this week.

Best Regards,
SuhYoung YOON

(HW) Sean Chiang

2022-05-05 20:43

developer   ~0009971

Hi Mr.Yoon,

Update meeting tracker as attachment.


Thanks,
Regards,
Sean

(HW) Sean Chiang

2022-05-12 19:02

developer   ~0010018

Hi Mr.Yoon,

Please refer to the attached file for the tomorrow's meeting.

Thanks,
Regards,
Sean

(ALTech) SY Yoon

2022-05-16 09:50

developer   ~0010035

Hi Mr. Canon. Hsieh and Mr. Sean Chiang,

I summarized last week's meeting minute.
If there is any misunderstandings, please let us know.

1. HW
    a. FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1417)
           New sample using Kepton tape.
        Foxconn TW already received sample on 5/12.
            Foxconn HW QA test it first, and then arrange the HALT test schedule.
            Foxconn will inform to ALT about the schedule for HW QA and HALT schedule next week.
    b. 2nd source(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1357)
        Foxconn asked ALT to reply BMT schedule on e-mail.
            ALT sent e-mail on the BMT schedule for 2nd source on 5/13.
            Foxconn already done CRC Test, but many engineers were working at home due to COVID-19.
            So it take time to check the test result include Throughput test etc.
            But Foxconn think that all test will be done in this week. So it will provide by next week.
            Foxconn engineer, Mr. Tom Lee, asked to consign DC/DC power HL 7593WL08
            that Halo microelectronic is not Fii's QVL vendor. But it should not be a consign component.
            Foxconn need designate letter. So ALT asked Foxconn to correct it on mantis.
    c. Broken FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1373)
         Foxconn confirmed that the root cause of this issue is that they repaired it 2 times.
             ALT asked Foxconn to add FFC cable test after FFC repair.
    d. PCB Burned(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1428)
         Foxconn worried that Maylar on common filter may cause the noise due to detach after assembly.
             ALT discussed it internally. It will not detach after assembly if there is no defect during SMT.
             There is no need new common mode filter drop test with package. ALT doesn't need drop test it.
             ALT will check how easy to broken with sample in Korea with new sample.
    e. CS manual
             Mr. SH Son will comment it after review.
    f. MP adaptor conduction issue(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1469)
         ALT will check the which items should be deliver from Foxconn TW by next Monday.
    g. GPIO issue review(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1468)
         Foxconn Factory had 2 defect samples. They already reproduce this symptom.
             ALT is waiting for the feedback from Foxconn VN.
         Foxconn wants to join this discussion. But Foxconn engineer Mr. Dean already join the wechat group.
    
2. Factory
    a. Void issue.
             Foxconn will change some part of metal mask and conduct control run. We keep monitoring it.
    b. Golden sample.
             ALT asked Foxconn to close it.
3. Eagle
    a. 2nd source(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1353)
        E-PHY :
        ALT already feedback the status BMT on Eagle by e-mail.
        BT Part :
                Biz team keep discussing about it.

Best Regards,
SuhYoung YOON

(PM) Canon Hsieh

2022-05-19 19:25

developer   ~0010051

Hi Mr.Yoon,

Please refer to the attached file for the tomorrow's meeting.

Thanks,
Regards,

(ALTech) SY Yoon

2022-05-22 21:53

developer   ~0010056

Hi Mr. Canon. Hsieh and Mr. Sean Chiang,

I summarized last week's meeting minute.
If there is any misunderstandings, please let us know.

1. HW
    a. FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1417)
        Foxconn will conduct HALT test in Foxconn's Lab.
            Foxconn test Lab can conduct all HALT items.
            It may takes about 2 day.
        HALT will conduct the early of July. Foxconn will check to pull in the schedule.
        ALT asked Foxconn to conduct the text earlier than the schedule.
    b. 2nd source(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1357)
        There is any updated on 2nd Source test from SKB.
        Foxconn asked ALT to update when there is any update on BMT schedule.
            ALT will provide designate letter for DCDC coverter, HL7593WL08, after receiving the price information..
    c. Broken FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1373)
        Foxconn will discuss with Factory and update next week.
    d. GPIO issue review(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1468)
        Foxconn will share the test result of AUX issue by today(5/20).
            ALT has already 9 defected samples include Foxconn factory has.
            Foxconn will make plan for next step for investigation.
2. PM
    a. Material Shortage
        The L/T of Cypress(BT for eagle) - 54 W
        Foxconn need PO for 2022 Q4 ~ 2023 Q2
        SWAN Awinic component : LED Driver.
        L/T getting worse.
        Foxconn asked ALT to decide Risk buy for 20K.
                If ALT doesn't, then it may impact the demand after Aug.

Best Regards,
SuhYoung YOON

(PM) Canon Hsieh

2022-05-26 18:07

developer  

(PM) Canon Hsieh

2022-05-26 18:07

developer   ~0010079

Hi Mr.Yoon,

Please refer to the attached file for the tomorrow's meeting.

Thanks,
Regards,

(ALTech) SY Yoon

2022-05-30 19:28

developer   ~0010091

Hi Mr. Canon. Hsieh and Mr. Sean Chiang,

I summarized last week's meeting minute.
If there is any misunderstandings, please let us know.

1. HW
    a. FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1417)
        Foxconn doesn't have enough weights for test.
            So FFC cable should be tested one by one. So it need another 5 days.
        ALT asked to use same FFC cable when Foxconn conduct HALT test.
            So Test FFC Cable should be used for both Foxconn test step 1 and step 2.
        Before starting step 2 test, Foxconn will check the FFC Cable with Multimeter.
    b. 2nd source(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1357)
         ALT provided test report and its summary to SKB.
                ALT is waiting for SKB's review result.
                SKB asked us to explain SW readiness. ALT will prepare the SW that can apply both old and new HW.
                SKB asked us to more detail plan for SW implementation, such as
                            how ALT/Foxconn will handle 4 components combination with 1 SW image.
                ALT need Foxconn's review about it.
           On designate e-mail, ALT wants to know the cost of DC DC Converter first.
                But Foxconn need designate e-mail to get competitive price from vendor.
             It will be discussed more between Biz teams of both parties.
    c. Broken FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1373)
         New SOP was provided on Mantis. It is the final version. Foxconn thinks that it caused by OP fault.
            ALT thinks that the cable in SOP is not correct. So ALT asked Foxconn to check it again and feed about it.
    d. PCB Burned(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1428)
         ALT reviewed common filter cover material. It is not easy to break. ALT doesn't need a drop test in component level.
    e. MP adaptor conduction issue
             ALT already provided test result and samples to adaptor vendor.
             ALT will update when they receive any plan or schedule to review by Adaptor vendor.
    f. GPIO issue review(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1468)
         Foxconn already exchange NG SoC on normal PCBA, and its result was fail.
             Foxconn will send NG SoC to SOC Vendor. Foxconn will provide its schedule to ALT soon.
             ALT asked Foxconn to provide 8D Report for CH- Button keep pressing issue.
             It fixed with some re-heating on SoC.
2. PM
    a. Eagle RMA 13K
             ALT shipping plan is 6/10 ETD Incheon
             ALT needs to confirm the RMA list by 5/31
         Foxconn doesn't have any issue yet.
             If Foxconn has something to check for customs clearance, then Foxconn will inform before 5/31.
    b. Material Shortage
         Awinic component Risk Buy is discussed in 5/26 meeting.
             It needs more discussion with both biz teams.
3. Next Generation of Eagle
    a. SDK
            It is difficult to provide SDK to ALT due to license issue.
            If SKB provide Bitbucket, then Foxconn will provide it on Bitbucket.
        Before then, Foxconn will provide test image to ALT, and the ALT should test it.
    b. Schedule
        Foxconn didn't received X4 SoC yet. So the schedule might be delayed a week.
            Foxconn will provide schedule for this.
    c. SW development
        ALT will provide 2 samples for FII SW development.
            The cost of samples should be consider NRE for samples that build by Foxconn.

Best Regards,
SuhYoung YOON

(HW) Sean Chiang

2022-06-02 21:02

developer  

(HW) Sean Chiang

2022-06-02 21:02

developer   ~0010108

Hi Mr.Yoon,

Please see attached for updated weekly meeting agenda.

Thanks,
Regards,

(ALTech) SY Yoon

2022-06-03 16:36

developer   ~0010109

Dear Mr. Canon. Hsieh and Mr. Sean Chiang,

I reviewed weekly meeting agenda.
I leave the comment as follows.
1. PM & Sales
    Eagle RMA 13K
               We asked you to send confirm e-mail if you don't have any issue for the RMA STB list.
               If we cannot send it if you don't give a confirmation to send it.
2. HW & ME
    FFC Cable melted and common choke burned
               We will check the issue and leave comment when we find out any issue.
               Currently we don't have any issue.
    MP Adaptor conduction issue
               Adaptor vendor will test Failed Sample from next Tuesday(6/7).
               We will update if we have any feedback from them.
    GPIO Issue
               Please update NG SoC review plan from Synaptics.
               We saw the CH- button FA report on Mantis.
               But there is no corrective action. So please let us know how you will handle this issue to avoid in MP.
               We keep receiving Failed STBs from the field.
3. Factory
    Void issue
               We will review your report and discuss more.
4. S905X4 Project
    As I sent an e-mail, SKB asked us to hold this project.
    They are reviewing their situation first.
    We will update when we get any information soon.

Best Regards,
SuhYoung YOON

(HW) Sean Chiang

2022-06-09 18:40

developer   ~0010142

Hi Mr.Yoon,

Please refer to the attached file for tomorrow's meeting.


Regards,
Sean

(ALTech) SY Yoon

2022-06-13 09:12

developer   ~0010151

Dear Mr. Canon. Hsieh and Mr. Sean Chiang,

I reviewed weekly meeting agenda.
I leave the comment as follows.

1. HW
    a. FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1417)
        Foxconn will provide test result by 6/13.
            Foxconn will conduct HALT from 6/14 by Foxconn QA and 3rd party Lab.
    b. Broken FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1373)
        Foxconn will introduce a new Fixture for main b'd Ass'y.
            It will be ready by 6/24. After control run using a new fixture, Foxconn will have control run.
    c. PCB Burned(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1428)
        Foxconn Factory have control run with short term solution by 6/13.
            Short term solution is using common mode filter with Mylar.
        But the mylar detached during production, 3M tape will be attach on top of common mode filter.
    d. MP adaptor conduction issue
            Adaptor vendor conducted test with both normal and problematic Adaptor.
            But they conducted it without STB, so test result is PASS.
            ALT asked them to test again with STB. They will conduct and feedback to ALT soon.
    e. GPIO issue review(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1468)
        ALT already request RMA to Synaptics for defected SOC and received review result.
            ALT will share it with Foxconn.
            Foxconn already sent defected SoC to Synaptics and they will feedback it next week.
        Foxconn asked to provide another defected samples to their Factory.
            Foxconn think that they need additional samples to investigate for this issue.
            Foxconn need x-section test to check the soldering issue.
            But ALT worried about that some samples cannot reproduce easily.
        So ALT will ask to review whether they can reproduce it or not.
        Foxconn will check how they will handle this issue in their factory.
    
2. PM
    a. Eagle RMA 13K
            ALT will ship RMA STB by 6/19 ETD Incheon.
        It is 1 day delay than plan.
    b. Foxconn PM will change from Mr. Canon to Ms. Eva.

Best Regards,
SuhYoung YOON

(HW) Sean Chiang

2022-06-16 21:57

developer   ~0010192

Hi Mr.Yoon,

Please refer to the attached file for tomorrow's meeting.

Regards,
Sean

(PM) Eva Sun

2022-06-17 12:36

developer   ~0010198

Hi Mr.Yoon,

Please refer to the attached file for today's meeting. TKS!

BR,
Eva Sun

(ALTech) SY Yoon

2022-06-17 13:09

developer   ~0010199

Dear Ms. Eva Sun and Mr. Sean Chiang,

I reviewed weekly meeting agenda.
I leave the comment as follows.

1. HW
    a. FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1417)
        Foxconn finished HALT test this week. Foxconn will provide test report by 6/17.
        There is no issue.
    b. PCB Burned(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1428)
        Foxconn has 2 options for short term solution.
        Case 1) Use Mylar attached top of choke coil
        Case 2) Use 3M Tape.
        Foxconn already had control run for case 1 and there was no issue.
        But Foxconn Factory think that the case 2 is the better solution.
        ALT discussed it internally. ALT's preference is case 2.
            If there is no issue during control run, then please use case 2.
            If there is any cost issue, please discuss before apply.
    c. MP adaptor conduction issue
            Adaptor vendor didn't book the test Lab. yet.
        ALT keep pushing vendor to book and test with product level.
        Once the vendor provides any update, ALT will update it to Foxconn.
    d. GPIO issue review(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1468)
        Foxconn needs additional samples to investigate Button pressing issue.
        ALT has 5 defected samples, 3 button issues and 2 AUX issues.
        Foxconn need 2 additional sample for button issue investigation. ALT will arrange sample to Foxconn factory.
        On AUX issue, ALT provide Synaptics' FA report. Synaptics thought that it caused by EOS.
        Foxconn may receive Synaptics' FA report by the end of this week. Foxconn will check after receiving FA report.
        Foxconn think that Foxconn is ready for ESD protection level for KC certification.
            ALT think that Foxconn should review ESD contact test.
            ALT will provide guide document for ESD contact test on AUX port.
        Foxconn doesn't need additional defected sample to investigate AUX issue.
    
2. Factory
    a. Void issue.
        ALT need update on current status update on X-ray inspection rate per hour.
            So ALT asked to update about it via e-mail. After that, ALT and Foxconn start to discuss about the condition for test.
3. PM
    a. Eagle RMA 13K
            ALT will ship RMA STB by 6/19 ETD Incheon.

Best Regards,
SuhYoung YOON

(ALTech) Lonnie Kim

2022-06-17 13:36

developer  

(ALTech) Lonnie Kim

2022-06-17 13:36

developer   ~0010200

Hi, Sean

I updated below data.
1. Signal line contact points for ESD contact test
- 2kV, 4KV, 8KV, 15KV, 16KV, 17KV, .......up to port died
2. ESD protector change consideration
- We think 3.3V protector is not suitable to AUX port. Please consider 5V protector.

Best regards

Lonnie Kim
RClamp5031ZA.pdf (876,803 bytes)
ESD.pdf (128,061 bytes)

(HW) Sean Chiang

2022-06-23 18:28

developer  

(HW) Sean Chiang

2022-06-23 18:28

developer   ~0010237

Hi Mr.Yoon,

Please refer to the attached file for tomorrow's meeting.


Regards,
Sean

(ALTech) SY Yoon

2022-06-24 19:18

developer   ~0010246

Dear Ms. Eva Sun and Mr. Sean Chiang,

I reviewed weekly meeting agenda.
I leave the comment as follows.

1. HW
    a. FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1417)
        Foxconn will provide the photos of Kepton tape of DUTs by early of next week.
    b. Broken FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1373)
        New fixture made by vendor by hand. Foxconn factory will review about assembling.
        Vendor will make it after review. It need another 2 weeks.
            Foxconn will arrange control run after receiving new Fixture from vendor.
    c. MP adaptor conduction issue(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1469)
            ALT attached test result on Mantis.
            Adaptor vendor will provide 8D report.
    d. GPIO issue review(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1468)
        Foxconn SW engineer is discussing with Synaptics on the register value change.
        Foxconn NG SoC cannot send to Synaptics until Synpatics provide their DHL account.
        Foxconn Factory have sent it on 6/17.
        ALT asked Foxconn to provide Fedex account to send 2 button defected samples for Foxconn investigation.
        Foxconn will discuss about it with Biz team and inform their decision by early of next week.
    
2. Factory
    a. Void issue.
        ALT will provide OBA format on mantis.

3. PM
    a. X4 schedule.
            SKB will discuss about X4 project early of July.
            ALT will update when ALT receive any update from SKB.
            ALT can update when Mr. Vincent Tung visit Korea.

Best Regards,
SuhYoung YOON

(HW) Sean Chiang

2022-06-30 18:37

developer   ~0010281

Hi Mr.Yoon,

Please refer to the attached file for tomorrow's meeting. Thanks.


 Regards,
 Sean

(ALTech) SH Son

2022-07-01 08:04

developer  

(ALTech) SH Son

2022-07-01 08:04

developer   ~0010284

Hi Mr. Sean
I update meeting agenda of factory and Eagle sheet.

Please refer to the attached file.

Thanks
SON

(ALTech) SY Yoon

2022-07-01 13:23

developer   ~0010293

Dear Ms. Eva Sun and Mr. Sean Chiang,

I summarized last week's meeting minute.
If there is any misunderstandings, please let us know.

1. HW
    a. FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1417)
         ALT will leave comment on Mantis by today. Currently ALT doesn't have any additional question on it.
    b. Broken FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1373)
         Foxconn will get PO by next Monday about new fixture.
         ALT will not pay about to use additional fixture.
    c. MP adaptor conduction issue(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1469)
             Adaptor vendor will provide 8D report soon. ALT will update when ALT receive it from Vendor.
    d. GPIO issue review(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1468)
         ALT asked to check why HW and SW design are not matched.
             Foxconn HW side update their opinion on Mantis. ALT thinks that it is not enough.
         ALT needs the opinion of Foxconn SW side.
         ALT asked Foxconn PM Ms. Eva SUN to ask update it to SW engineer.
             ALT also asked to update how Foxconn can consider about HW and SW design, such as register value set.
    
2. Factory
    a. SWAN 2022.05 Mass production inspection report
         Foxconn will discuss with Factory and update it.
             ALT asked Foxconn to update target date at least.
    b. SWAN 2022.01-03 Mass production inspection report.
         Foxconn will discuss with Factory and update it.
             ALT asked Foxconn to update target date at least.
    c. SWAN Extra Product, PCBA and Spare parts for RMA
         Foxconn will discuss with Factory and update on Mantis.
    
3. Eagle
    a. CS materials for out of warranty
         ALT will send official e-mail about it. After that ALT and Foxconn should start to discuss about it.
    b. FA report
         ALT asked Foxconn to update FA report as a final version.
             There is initial version on Mantis.
             Foxconn will check with factory and update it on mantis(the target date at least).

Best Regards,
SuhYoung YOON

(HW) Sean Chiang

2022-07-07 19:47

developer   ~0010331

Hi Mr.Yoon,

Here is the updated agenda for tomorrow's meeting. Thanks.


Regards,
Sean

(ALTech) SY Yoon

2022-07-08 15:01

developer   ~0010336

Dear Ms. Eva Sun and Mr. Sean Chiang,

I summarized last week's meeting minute.
If there is any misunderstandings, please let us know.

1. HW
    a. FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1417)
        Foxconn will conduct control run with new FFC Cable on 7/11.
        ALT asked Foxconn that it should be discussed between Alt Biz team when it need any cost concern.
    b. Broken FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1373)
        Foxconn expect that there is no price defect.
    c. PCB Burned(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1428)
        Vendor will provide new common filter. It will deliver to Foxconn VN Factory by 7/29.
            Foxconn Factory will conduct control run early of Aug.
    d. MP adaptor conduction issue(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1469)
            ALT will meet Adaptor vendor today.
            ALT will leave comments after meeting with vendor.
    e. GPIO issue review(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1468)
        Foxconn has a responsibility on HW/SW design.
            If there are any issues with SoC, it should be handle by Foxconn.
         So if there is any wrong value set in register value, Foxconn is responsible for handling it.
        ALT sent defected samples to Foxconn factory yesterday.
        ALT failed on SKB IQC in their factory.
        ALT got 3 ethernet defect sample. Due to those defects, IQC failed for the latest LOT, 4K-LOT.
        SKB changed their inspection rule from sampling inspection to a full inspection.
            And SKB changed their condition for IQC both Eagle and SWAN.
        And SKB will give some penalty due to this fail.
        ALT will let Foxconn know when SKB decide the penalty.
    
2. Factory
    a. [SWAN] [MP] 2022.01-03 Mass production inspection report
             (https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1465)
         Foxconn provide report on Mantis.
             ALT left some comments on Mantis.
             Foxconn will review and leave any comment on mantis.
             On LED issue, Foxconn factory reviewed and finalize that it caused by customer, ALT.
         But ALT wants to know the Foxconn factory's action to prevent to misalign the sponge.
    b. SWAN Extra Product, PCBA and Spare parts for RMA
         Foxconn Factory will check when they can send materials for repair and they will inform the target date.

3. Eagle
    a. CS materials for out of warranty
        Foxconn is checking on the price of components. But 3 of them is in review of their price by 7/11.
        Foxconn can provide price list next week.
        ALT asked Foxconn to check whether Foxconn can sell some components that ALT asked.
    b. FA report(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1465)
        ALT left some comment on Foxconn factory's report on mantis.
            ALT asked Foxconn to check and leave comments on mantis.

Best Regards,
SuhYoung YOON

(HW) Sean Chiang

2022-07-14 18:28

developer   ~0010377

Hi Mr.Yoon,

Please refer to the attached file for tomorrow's meeting. Thanks.


Regards,
Sean

(ALTech) SY Yoon

2022-07-15 13:59

developer   ~0010389

Dear Ms. Eva Sun and Mr. Sean Chiang,

I summarized last week's meeting minute.
If there is any misunderstandings, please let us know.

1. HW
    a. FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1417)
        Foxconn will finish control run by 7/15 and will report its result by 7/16.
    b. Broken FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1373)
        Foxconn expects that they can receive fixture by the end of next week if there is any issue.
        Foxconn factory need some internal test after receiving fixture.
        So Foxconn factory can apply it from next next week.
    c. PCB Burned(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1428)
        No update and no changes on schedule.
    d. MP adaptor conduction issue(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1469)
            Adaptor vender tried to find the root cause and countmeasure with various samples, but they failed.
            They are concentrating on Line filter(coil) first. They had plan to test with additional adaptor samples
         with various test condition from this week to next week.
        ALT will update any test result when they receive from vendor.
    e. GPIO issue review(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1468)
        Foxconn already changed register value that Synaptics recommended.
        ALT already provided 2 defect samples for Foxconn factory review.
        Those samples is in VN customs. ALT asked Foxconn to check it and start to analyze it ASAP.
    f. Ethernet issue
        ALT asked ethernet issues(Packet loss and no work) in weekly tracking item.
            Foxconn will add it.
        Foxconn factory can finish customs clearance and will receive it by today.
        Foxconn factory will start to review this issue from tomorrow(7/16).
        Foxconn agreed that this issues are very critical for SKB Biz.
        So Foxconn will follow up it as a top priority.
    
2. Factory
    a. [SWAN] [MP] 2022.05 Mass production inspection report( https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1493)
        Foxconn will update it by 7/16
    b. [SWAN] [MP] 2022.01-03 Mass production inspection report( https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1465)
        There is no update on ALT's question on mantis.
        Foxconn factory will update it by today.

3. Eagle
    a. CS materials for out of warranty
        Foxconn will provide its latest version on Excel format today.
        ALT needs the cost of each part, but ALT will discuss the cost of part based on the document that Foxconn provide with.
    b. FA report(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1465)
        Foxconn update only BT FA report in this week. But there is no update on other questions from ALT.
        ALT will leave some comments on BT issue. Foxconn will feedback about it soon.
    c. Shield CAN
        Foxconn will provide the cost and change list for removal of Shield CAN by next Wednesday.
    d. Eagle 2nd version
        ALT will update on this Eagle 2nd version status in SKB next week.

4. PM&Sales
    a. Eagle RMA
        ALT will send 2nd patch for Eagle RMA. It's q'ty will be about 10K.
        Foxconn factory will send information whether ALT should prepare any other documents for 2nd patch
            after theie internal meeting via e-mail by today.

Best Regards,
SuhYoung YOON

(HW) Sean Chiang

2022-07-21 23:11

developer   ~0010440

Hi Mr.Yoon,

Please refer to the attached file for tomorrow's meeting. Thanks.


Regards,
Sean

(ALTech) SY Yoon

2022-07-22 17:16

developer   ~0010455

Dear Ms. Eva Sun and Mr. Sean Chiang,

I summarized last week's meeting minute.
If there is any misunderstandings, please let us know.
1. PM
    a. Eagle RMA
         Foxconn VN informed that there is no additional document for next RMA batch.
    b. DST-Technical questionnaire(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1512)
             SKB asked us to fill in this document by 7/22.
             We uploaded this document on mantis#1512.
    c. Eagle 2.
         There is no update from SKB.
2. HW
    a. FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1417)
         ALT left comments on mantis. ALT needs FFC cable for repair.
         Foxconn VN will inform when Foxconn can use new cable for MP by next week.
    b. Broken FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1373)
         Foxconn received new fixture, but it has some problem.
             Vendor will provide fixture by 7/25, and Foxconn VN will check it again next week.
    c. PCB Burned(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1428)
         Foxconn can start control run with new common filter component next week.
          Foxconn VN will update control run schedule.
    d. MP adaptor conduction issue(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1469)
             Adaptor vendor tested new samples that made by hand this week. They have some improvement in there.
             But they doesn't find out root cause yet. Adaptor vendor will prepare new sample that produce in their factory.
         And they increase no. of sample and test again. Vendor is waiting for sample delivery schedule now.
         ALT will update when the sample deliver schedule is fixed.
3. Factory
    a. [SWAN] Extra product, PCBA and Spare parts for RMA
             ALT wants to receive Extra Product and PCBA with SWAN Delivery on July.
             Foxconn VN think that Extra spare parts should be delivered separately.
             So Extra spare parts will be deliver in Aug.
             Detail shipping schedule should be discuss later.
         Foxconn VN will ask for Serial no. of Extra product.
    b. [SWAN] [MP] 2022.06 Mass production inspection report(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1506)
        i. Ethernet unstable :
             Foxconn VN think that the root cause is Ethernet PHY. Foxconn VN will send defected part to Realtek.
                     Foxconn VN will inform RMA schedule to ALT.
                     ALT is difficult to understand current situation. There was no issue during production,
                     but PT station can filter as a defected unit when it is tested after return to VN.
                     ALT wants to know what is the different between first test and 2nd test in the Factory.
                     ALT ask to Foxconn to investigate more how to filter those issue during production.
        ii. No Ethernet
                     Foxconn VN solder SoC again and test at PT station. It passed.
                     But Youtube contents is played for 2Hr during OBA Test, the issue happen again.
             ALT asked Foxconn to test defected unit at PT station.
                     Foxconn will inform after test.
        iii. No Boot
                     Short with heat sink :
              Foxconn Factory think that 24V power pin to connect heat sink. That made boot fail.
                          ALT already tested without housing in Korea. So ALT thought that short is not a root cause.
                          ALT asked Foxconn to test power cycle for 24Hr and it should turn on/off every 3 min., cold boot.
              Foxconn Factory will do and inform the test result.
             Boot fail during OBA test
              Foxconn tested defected unit with PT station and OBA. It worked
                          But this unit had boot fail issue after 2Hr of OBA test.
                          Foxconn RD(SW part) will join the investigation of this issue.
        iv. Button issue
                     Foxconn factory will do Dye and Pry test and cross-section.
                     Foxconn will update its result by next Friday.
        v. No sound, LED not work, Power button tact feeling is NG
                     Foxconn Factory will update its result by today, 7/22.

Best Regards,
SuhYoung YOON

(HW) Sean Chiang

2022-07-28 19:38

developer   ~0010485

Hi Mr.Yoon,

Please refer to the attached file for tomorrow's meeting. Thanks.


Regards,
Sean

(ALTech) SY Yoon

2022-07-29 19:21

developer   ~0010489

Dear Ms. Eva Sun and Mr. Sean Chiang,

I summarized last week's meeting minute.
If there is any misunderstandings, please let us know.

1. PM
    a. Eagle RMA
         Foxconn VN informed that RMA units already arrive in VN Factory.
             Foxconn will start repair from 7/30.
             Foxconn VN Factory will update the RMA repair and delivery schedule by 8/1.
2. HW
    a. FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1417)
         Foxconn factory will confirm the cost by 8/3, but there is no cost impact with new cable.
             ALT left comments on mantis. ALT needs FFC cable for repair.
         Foxconn factory will have discussion internally and feedback about it by next week.
    b. Broken FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1373)
         There are some delay on fixture delivery.
             Foxconn factory receive new fixture yesterday. It will be used from next MP if there is no issue.
    c. PCB Burned(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1428)
         Foxconn factory is in control run with new common filter.
             Foxconn factory will provide control run report by next week.
    d. MP adaptor conduction issue(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1469)
             Adaptor vendor has 2 test items.
             1- Test with samples that replace line filter in current adaptor. It use new line filter that made by factory.
         2- Test with samples that new adaptors. It use new line filter and it made by factory.
             Test item 1 was tested yesterday. The result is good. But ALT didn't receive any report from vendor.
             Test item 2 may test next week. It takes time to prepare and deliver from factory in china.
             ALT will provide test report from vendor if there test result may acceptable.
             Vendor is still looking for root cause.
3. Factory
    a. [SWAN] [MP] 2022.05 Mass production inspection report
             ALT asked 8D report on AMP B'd and LED B'd. But there is no update.
         Foxconn Factory will update it by 8/5
    b. [SWAN] [MP] 2022.01-03 Mass production inspection report
             ALT asked to update about no boot issue.
             Foxconn Factory thought that Silergy is damaged, but vendor investigate and there was no issue on part level.
             ALT asked Foxconn Factory what the next step is. Foxconn will review it and update by today.
    c. [SWAN] Extra product, PCBA and Spare parts for RMA
             There is no changes on the schedule.
    d. [SWAN] [MP] 2022.06 Mass production inspection report(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1506)
        i. No Boot.
                   1st no boot unit - ALT asked to check the log that ALT attached on mantis. There is no update on it.
                            Foxconn will review it with SW engineer and will leave comments.
                ii. There are many soldering issue, such as 2nd no boot unit, No ethernet unit and Button issue.
                    ALT asked Foxconn to prepare any improvement plan for soldering issue.
                    Foxconn will invite their Quality manager next weekly meeting.
                    ALT asked Foxconn to provide any document that ALT can review before the meeting.
            Foxconn will provide any document by 8/4 morning.
                iii. Ethernet unstable unit - ALT asked Foxconn to provide RMA schedule.
                     Foxconn will give some update after check with SQA.
    e. GPIO Issue.
         ALT asked Foxconn to add this issue on Weekly tracking issue agenda.
         Foxconn will update their Dye & Pry test and cross section result by this week.
4. Eagle
    a. LED Defect(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1448)
         It is about LED Sponge misalign issue.
             Foxconn factory think that this issue caused by customer, ALT. But we didn't touch it.
             ALT asked some questions on this issue. But Foxconn didn't feedback yet.
             Foxconn factory will review and leave some comments on mantis.

Best Regards,
SuhYoung YOON

(HW) Sean Chiang

2022-08-04 18:38

developer   ~0010533

Hi Mr.Yoon,

Please refer to the attached file for tomorrow's meeting. Thanks.


Regards,
Sean

(ALTech) Lonnie Kim

2022-08-04 19:01

developer   ~0010534

Hi, Sean

Please add to your tracking list about attached items.

Best regards

Lonnie Kim
ALT adding items.xlsx (11,598 bytes)

(ALTech) SY Yoon

2022-08-05 17:13

developer   ~0010542

Dear Ms. Eva Sun and Mr. Sean Chiang,

I summarized last week's meeting minute.
If there is any misunderstandings, please let us know.

1. PM
    a. Eagle RMA
        ALT wants to know the current status of RMA repair. How many units does Factory decide to Non-defected units ?
            Foxconn VN will update the current status of RMA by today.
2. HW
    a. FFC Cable(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1417)
        Foxconn informed the q'ty of units without FFC cable short term solution.
        It is 4.7K.
        Foxconn will discuss internally about the support additional FFC cable for repair.
            Foxconn will discuss with FFC vendor can provide any cost increase, and inform it to ALT.
    b. Defected FFC cable.
        Foxconn factory received the fixture and ready to apply FATP.
            The test is OK and will use from next MP.
    c. PCB Burned(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1428)
        Foxconn factory already finish control run. There is no issue during control run.
            ALT reviewed the control run report and doesn't have any concern if there is any cost impact.
        Foxconn informed that there is no cost impact. And Foxconn will issue ECO by today.
            ALT will leave the comment "Go next step" on mantis.
    d. MP adaptor conduction issue(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1469)
            Adaptor vendor didn't produce new adaptor that use new line filter yet because the material shortage.
        Their plan is
        Vendor will produce new adaptor by 8/15.
        Vendor will start EMI test from 8/22.
        Vendor thinks that the root cause is the issue of coil winding shape. If it is not even, then it make some issue.
        ALT will review the vendor's test report with increase no. of DUT.
3. Factory
    a. Vietnam Factory report on defected issue.
            - 1.1. No boot
              ALT provided defected PCBA only. And Foxconn assemble the housing and tested.
              Foxconn cannot found any other boot issue after cut the component leg.
              ALT asked the captured log in mantis. Foxconn reviewed it.
              Foxconn thought that there are 2 boot log in the captured log.
              But the symptom is not same on tzk related. So ALT asked Foxconn to check the eMMC stability.
          So Foxconn will eMMC R/W test with defected Unit in factory and normal unit in TW office.
              After test, Foxconn will provide it.
              In RMA process, there is no SW update for OBA test. After issue reproduce during RMA,
              STB SW may upgraded for repair.
    - 1.2 No boot
              Foxconn asked to provide additional defected units.
              ALT asked Foxconn to help how ALT can ALT decide the defected units caused by soldering issue.
              Foxconn think that the impedance of GPIO that has soldering issue is high.
              Foxconn will inform how ALT can measure GPIO Impedance.
    - 2 No ethernet.
              Foxconn didn't change SoC during the re soldering(FA step 7).
              Foxconn just resolder the SoC, then it work without any issue.
              Resoldering means that Foxconn heat again SoC area of PCBA with heat gun.
              Foxconn still have 2 test now. After test, Foxconn update test report on Mantis.
    - 3. Ethernet unstable.
              Foxconn provide defected Ethernet PHY to vendor on 7/26. Vendor will update the RMA result by 8/12.
    - 4. HDMI cable defect.
              FIT tested HDMI cable in stock. FIT has 17K cables. Currently they tested 2686 pcs, but there is no issue.
              ALT concern why FIT cannot found issue even though we have 5 defected units.
              ALT asked FIT to check LOT information that include defected HDMI cable.
              And they will test units that has same LOT no. first.
    b. [SWAN] [MP] 2022.05 Mass production inspection report
             ALT asked 8D report update on AMP B'd and LED B'd. But there is no update.
         Foxconn Factory will update it by 8/5
    c. [SWAN] [MP] 2022.01-03 Mass production inspection report
            Foxconn asked vendor to return silergy IC, Silergy is looking for it that Foxconn sent for RMA.
            Defected unit worked normal when Foxconn replaced silergy component to new one.
            If Silergy cannot find the defected component, then Foxconn cannot debug more.
    d. [SWAN] Extra product, PCBA and Spare parts for RMA
            There is no changes on the schedule. Extra product and PCBA already shipped.
            And extra spare parts will be ship on 8/12.
    e. [SWAN] [MP] 2022.06 Mass production inspection report(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1506)
        Foxconn factory provide update on this issue. ALT and Foxconn discussed it. Please refer a.
    f. GPIO Issue.
        Please add it on tracking list.
        Foxconn will update Dye and Pry and cross section test result.
            There was no abnormal status.
        Foxconn asked additional defected sample. Foxconn needs 3 more at least.
4. Eagle
    a. 2nd source (https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1519)
            ALT has some ethernet issue on 2nd source HW.
        Foxconn cannot reproduce it. But ALT can reproduce it.
            It is a critical issue. So it should be resolve before apply new SW for MP
    b. Test plan of shielding removal
        On EMI test, Foxconn has some issue on 890MHz. Foxconn think that it caused by HDMI cable.
            Foxconn think that they can pass when they change HDMI cable.
            So Foxconn asked to test in Korea first. If there is no issue, then they will not test again.
        ALT asked Foxconn to provide test result.
            And ALT will review and feedback about Foxconn's opinion.
            The only solution that Foxconn has is replacement of HDMI Cable.
            ALT worried how it debug when ALT find the issue during test in Korea.
    c. Passive Standby
            It should be finalize within Aug. It is SKB's requirement.
            So ALT asked Foxconn to update the status on weekly tracking list.
            Foxconn worried that Synaptics should provide some solution to meet SKB's requirement(under 1W).
            ALT worried that ALT cannot test Eagle due to SW issue.
            It should be discuss with both HW and SW side, and update current status and plan.

Best Regards,
SuhYoung YOON
image.png (624,990 bytes)

(HW) Sean Chiang

2022-08-11 20:16

developer   ~0010605

Hi Mr.Yoon,

Hi Mr.Yoon,

Please refer to the attached file for tomorrow's meeting. Thanks.


Regards,
Sean

(ALTech) SY Yoon

2022-08-12 12:42

developer   ~0010622

Hi Mr. Sean Chiang and Ms. Eva Sun,
I updated today's meeting agenda on tacking list excel file that I attached here.
if you have any questions on the meeting minutes, please let us know

Best regards,
SuhYoung YOON

(HW) Sean Chiang

2022-08-18 19:13

developer   ~0010658

Hi Mr.Yoon,

Please refer to the attached file for the tomorrow's meeting.


Thanks,
Regards,

(HW) Sean Chiang

2022-08-18 19:14

developer   ~0010659

Attached the file.

(ALTech) SY Yoon

2022-08-19 16:43

developer   ~0010668

Last edited: 2022-08-19 16:48

Hi Mr. Sean Chiang and Ms. Miya Wang,
I updated today's meeting agenda on tacking list excel file that I attached here.
if you have any questions on the meeting minutes, please let us know

SWAN BMT Schedule :
      SKB BMT : ~ 8/22(delayed)
      Google Approval (FII test, 3PL Test and Google approval) : 8/17 ~ 9/7
      OTA : 9/8 ~ 10/7
      MP SW update : There is no critical issue on SKB OTA.

Best regards,
SuhYoung YOON

(HW) Sean Chiang

2022-08-25 22:25

developer   ~0010720

Hi Mr.Yoon,

Please refer to the attached file for the tomorrow's meeting.


Thanks,
Regards,
Sean

(ALTech) SY Yoon

2022-08-26 15:54

developer   ~0010726

Hi Mr. Sean Chiang and Ms. Miya Wang,
I updated today's meeting agenda on tacking list excel file that I attached here.
if you have any questions on the meeting minutes, please let us know

Best regards,
SuhYoung YOON

(HW) Sean Chiang

2022-08-31 23:52

developer   ~0010759

Hi Mr.Yoon,

Please refer to attached tracking list for tomorrow's meeting.


Regards,
Sean

(ALTech) SY Yoon

2022-09-01 13:27

developer   ~0010764

i Mr. Sean Chiang and Ms. Miya Wang,
I updated today's meeting agenda on tacking list excel file that I attached here.
if you have any questions on the meeting minutes, please let us know

Best regards,
SuhYoung YOON

(HW) Sean Chiang

2022-09-07 18:33

developer   ~0010827

Hi Mr.Yoon

I updated tracking list for tomorrow's meeting as attachment.


Regards,
Sean

(ALTech) SY Yoon

2022-09-08 12:50

developer   ~0010834

Hi Mr. Sean Chiang and Ms. Miya Wang,

I updated today's meeting agenda on tacking list excel file that I attached here.
if you have any questions on the meeting minutes, please let us know

Best regards,
SuhYoung YOON

(HW) Sean Chiang

2022-09-15 18:44

developer   ~0010874

Hi Mr.Yoon,

Please refer to attached tracking list for tomorrow's meeting.


Regards,
Sean

(ALTech) SY Yoon

2022-09-16 19:43

developer   ~0010886

Hi Mr. Sean Chiang and Ms. Miya Wang,

I updated today's meeting agenda on tacking list excel file that I attached here.
if you have any questions on the meeting minutes, please let us know

Best regards,
SuhYoung YOON

(HW) Sean Chiang

2022-09-22 17:33

developer   ~0010915

Hi Mr.Yoon,

Please refer to attached tracking list for tomorrow's meeting. Thanks.

Regards,
Sean

(ALTech) SY Yoon

2022-09-23 15:12

developer   ~0010925

Hi Mr. Sean Chiang and Ms. Miya Wang,

I updated today's meeting minutes.
if you have any questions on the meeting minutes, please let us know

Best regards,
SuhYoung YOON

(HW) Sean Chiang

2022-09-29 18:13

developer   ~0010951

Hi Mr.Yoon,

Please refer to attached tracking list for tomorrow's meeting.


Regards,
Sean

(ALTech) SY Yoon

2022-09-30 15:21

developer   ~0010958

Hi Mr. Sean Chiang and Ms. Miya Wang,

I updated today's meeting minutes.
if you have any questions on the meeting minutes, please let us know

Best regards,
SuhYoung YOON

(HW) Sean Chiang

2022-10-06 18:31

developer   ~0010982

Hi Mr.Yoon,

Here is an updated tracking list for tomorrow's meeting. Thanks.


Regards,
Sean

(ALTech) SY Yoon

2022-10-07 14:52

developer   ~0010991

Hi Mr. Sean Chiang and Ms. Miya Wang,

I updated today's meeting minutes.
If you have any questions on the meeting minutes, please let us know

Best regards,
SuhYoung YOON

(HW) Sean Chiang

2022-10-13 20:34

developer   ~0011044

Hi Mr.Yoon,

Please refer to the attached tracking list for tomorrow's meeting.

Thanks,
Regards,
Sean

(ALTech) SY Yoon

2022-10-14 16:18

developer   ~0011049

Hi Mr. Sean Chiang and Ms. Miya Wang,

I updated today's meeting minutes.
If you have any questions on the meeting minutes, please let us know.

Best regards,
SuhYoung YOON

(HW) Sean Chiang

2022-10-20 19:15

developer   ~0011085

Hi Mr.Yoon,

Update tomorrow's meeting agenda as attachment.


Thanks,
Regards,
Sean

(ALTech) SY Yoon

2022-10-21 12:43

developer   ~0011095

Hi Mr. Sean Chiang and Ms. Miya Wang,

I updated today's meeting minutes.
If you have any questions on the meeting minutes, please let us know.

Best regards,
SuhYoung YOON

(HW) Sean Chiang

2022-10-27 18:46

developer   ~0011123

Hi Mr.Yoon,

Please refer to the attached tracking list for tomorrow's meeting.

Thanks,
Regards,
Sean

(ALTech) SY Yoon

2022-10-28 16:03

developer   ~0011129

Hi Mr. Sean Chiang and Ms. Miya Wang,

As I mentioned in the meeting, please make tracking list based on the latest version.
Your tacking list was made based on 10/20, not 10/21 version.
I added 10/21 meeting minute in today's meeting minutes.

I updated today's meeting minutes.
If you have any questions on the meeting minutes, please let us know.

Best regards,
SuhYoung YOON

(HW) Sean Chiang

2022-11-03 20:53

developer   ~0011160

Hi Mr.Yoon,

Please refer to the attached tracking list for tomorrow's meeting. Thanks.


Regards,
Sean

(HW) Sean Chiang

2022-11-10 20:17

developer   ~0011203

Last edited: 2022-11-10 20:17

Hi Mr.Yoon,

Update tomorrow's meeting agenda as an attachment.


Thanks,
Regards,
Sean

(ALTech) SY Yoon

2022-11-11 14:13

developer   ~0011211

Hi Mr. Sean Chiang and Ms. Miya Wang,

I'm sorry not attached meeting minute last week. But I added our discussion result on this week meeting minutes.
And I updated today's meeting minutes.
If you have any questions on the meeting minutes, please let us know.

Best regards,
SuhYoung YOON

(HW) Sean Chiang

2022-11-17 23:22

developer   ~0011248

Hi Mr.Yoon,

Please refer to the attached tracking list for tomorrow's meeting.

Thanks,
Regards,
Sean

(ALTech) SY Yoon

2022-11-18 13:39

developer   ~0011252

Hi Mr. Sean Chiang and Ms. Miya Wang,

I updated today's meeting minutes.
If you have any questions on the meeting minutes, please let us know.

Best regards,
SuhYoung YOON

(HW) Sean Chiang

2022-11-24 20:20

developer   ~0011304

Hi Mr.Yoon,

Here is the project tracking list update for tomorrow's meeting.


Thanks,
Regards,
Sean

(ALTech) SY Yoon

2022-11-25 17:56

developer   ~0011323

Hi Mr. Sean Chiang and Ms. Miya Wang,

I updated today's meeting minutes.
I added SW image that you tested for DVT thermal test in tracking list.

If you have any questions on the meeting minutes, please let us know.

Best regards,
SuhYoung YOON

(HW) Sean Chiang

2022-12-01 17:49

developer   ~0011362

Hi Mr.Yoon,

Please refer to the attached file for tomorrow's meeting. Thanks.


Regards,
Sean

(ALTech) SY Yoon

2022-12-02 15:07

developer   ~0011370

Hi Mr. Sean Chiang and Ms. Miya Wang,

I updated today's meeting minutes.

If you have any questions on the meeting minutes, please let us know.

Best regards,
SuhYoung YOON

(HW) Sean Chiang

2022-12-08 19:19

developer   ~0011434

Hi Mr.Yoon,

Please refer to the attached file for tomorrow's meeting. Thanks.


Regards,
Sean

(ALTech) SY Yoon

2022-12-09 16:10

developer   ~0011448

Hi Mr. Sean Chiang and Ms. Miya Wang,

I updated today's meeting minutes.

If you have any questions on the meeting minutes, please let us know.

Best regards,
SuhYoung YOON

(HW) Sean Chiang

2022-12-22 19:42

developer   ~0011549

Hi Mr.Yoon,

Please refer to the attachment for tomorrow's meeting. Thanks.


Regards,
Sean

(ALTech) SY Yoon

2022-12-23 12:42

developer   ~0011559

Hi Mr. Sean Chiang and Ms. Miya Wang,

I updated today's meeting minutes.

If you have any questions on the meeting minutes, please let us know.

Best regards,
SuhYoung YOON

(HW) Sean Chiang

2023-01-05 19:48

developer   ~0011679

Hi Mr.Yoon,

Update weekly issue tracking list as attachment.
I also added the H/W & S/W tracking list for the year end workshop to the list.
Let's review it tomorrow.

Thanks,
Regards,
Sean

(ALTech) SY Yoon

2023-01-09 18:24

developer   ~0011727

Hi Mr. Sean Chiang and Ms. Miya Wang,

I updated meeting minutes of last Friday.

If you have any questions on the meeting minutes, please let us know.

Best regards,
SuhYoung YOON

(Sales) Miya Wang

2023-01-12 18:29

developer   ~0011753

Dear All

Please see attached.
Thanks.

Miya

(ALTech) SY Yoon

2023-01-13 15:26

developer   ~0011772

Hi Mr. Sean Chiang and Ms. Miya Wang,

I updated today's meeting minutes.
PM & Sales part update is not included due to keep discussing.
If you have any questions on the meeting minutes, please let us know.

Best regards,
SuhYoung YOON

Issue History

Date Modified Username Field Change
2021-11-12 10:44 (PM) Carey Lu New Issue
2021-11-12 10:44 (PM) Carey Lu File Added: ALT Fii SWAN tracking list 211112v1.xlsx
2021-11-12 10:45 (PM) Carey Lu Issue Monitored: (ALTech) SY Yoon
2021-11-12 10:45 (PM) Carey Lu Issue Monitored: (ALTech) Sophie Lee
2021-11-12 10:46 (PM) Carey Lu Issue Monitored: (HW) Sean Chiang
2021-11-12 10:46 (PM) Carey Lu Issue Monitored: (PM) Sheila Tu
2021-11-12 10:46 (PM) Carey Lu Issue Monitored: (PM) Christine Huang
2021-11-12 16:27 (ALTech) Sophie Lee Issue Monitored: (ALTech) BY Lee
2021-11-12 16:42 (ALTech) SY Yoon Issue Monitored: (ALTech) Lonnie Kim
2021-11-12 16:42 (ALTech) SY Yoon Issue Monitored: (ALTech) Sun Choul Joung
2021-11-12 16:42 (ALTech) SY Yoon Issue Monitored: (ALTech) SH Son
2021-11-12 16:42 (ALTech) SY Yoon Issue Monitored: (ALTech) JW Kim
2021-11-12 16:42 (ALTech) SY Yoon Issue Monitored: (ALTech) HY Lee
2021-11-12 17:02 (ALTech) SY Yoon Note Added: 0008727
2021-11-18 19:30 (PM) Carey Lu File Added: ALT Fii SWAN tracking list 211118_v2.xlsx.xlsx
2021-11-18 19:30 (PM) Carey Lu Note Added: 0008748
2021-11-19 12:52 (ALTech) SY Yoon Note Added: 0008754
2021-11-19 14:41 (SW) Jacky Chiang Issue Monitored: (SW) Jacky Chiang
2021-11-25 19:32 (PM) Carey Lu File Added: ALT Fii SWAN tracking list 211125 v1.xlsx
2021-11-25 19:32 (PM) Carey Lu Note Added: 0008787
2021-11-26 20:04 (ALTech) SY Yoon Note Added: 0008792
2021-11-30 19:04 (PM) Carey Lu File Added: FFC Cable board FA report_2021.11.30 V4.pptx
2021-11-30 19:04 (PM) Carey Lu Note Added: 0008810
2021-12-01 10:23 (ALTech) Lonnie Kim File Added: FFC Cable board FA report_2021.11.30 V4_ALT feedback.pptx
2021-12-01 10:23 (ALTech) Lonnie Kim Note Added: 0008815
2021-12-01 19:15 (ALTech) SY Yoon Note Added: 0008821
2021-12-01 19:28 (ALTech) SY Yoon Note Edited: 0008821
2021-12-02 18:57 (PM) Carey Lu File Added: ALT Fii SWAN tracking list 211203_HW v1.xlsx
2021-12-02 18:57 (PM) Carey Lu Note Added: 0008831
2021-12-09 19:13 (PM) Carey Lu File Added: ALT Fii SWAN tracking list 211210v1.xlsx
2021-12-09 19:13 (PM) Carey Lu Note Added: 0008889
2021-12-10 18:36 (PM) Carey Lu File Added: K18X001.00-DFM report_211210.xlsx.xlsx
2021-12-10 18:36 (PM) Carey Lu Note Added: 0008903
2021-12-10 19:02 (ALTech) SY Yoon Note Added: 0008904
2021-12-16 19:08 (PM) Carey Lu File Added: ALT Fii SWAN tracking list 211217_HW v2.xlsx
2021-12-16 19:08 (PM) Carey Lu File Added: K18X001.00-DFM report_211216.xlsx.xlsx
2021-12-16 19:08 (PM) Carey Lu Note Added: 0008934
2021-12-17 18:20 (ALTech) SY Yoon Note Added: 0008947
2021-12-23 17:28 (PM) Carey Lu File Added: ALT Fii SWAN tracking list 211224 v1.xlsx
2021-12-23 17:28 (PM) Carey Lu File Added: K18X001.00-DFM report_211223.xlsx.xlsx
2021-12-23 17:28 (PM) Carey Lu Note Added: 0009068
2021-12-24 16:53 (SW) Jacky Chiang Severity s3-moderate => s6-feature
2021-12-24 21:52 (ALTech) SY Yoon Note Added: 0009144
2021-12-27 16:24 (PM) Carey Lu Note Added: 0009147
2021-12-28 16:32 (ALTech) SY Yoon Note Added: 0009148
2021-12-29 11:12 (PM) Carey Lu Note Added: 0009160
2021-12-29 16:03 (ALTech) SY Yoon Note Added: 0009167
2021-12-29 16:52 (ALTech) SY Yoon Note Edited: 0009148
2021-12-30 15:14 (ALTech) SY Yoon Note Added: 0009176
2021-12-30 18:01 (PM) Carey Lu File Added: ALT Fii SWAN tracking list 211230 v1.xlsx
2021-12-30 18:01 (PM) Carey Lu File Added: K18X001.00-DFM report_211224.xlsx.xlsx
2021-12-30 18:01 (PM) Carey Lu Note Added: 0009183
2022-01-03 12:14 (PM) Carey Lu File Added: Swan 2nd source throughput issue.PNG
2022-01-03 12:14 (PM) Carey Lu Note Added: 0009190
2022-01-06 17:40 (PM) Carey Lu File Added: ALT Fii SWAN tracking list 220107 v1.xlsx
2022-01-06 17:40 (PM) Carey Lu File Added: K18X001.00-DFM report_220107.xlsx
2022-01-06 17:40 (PM) Carey Lu Note Added: 0009289
2022-01-10 18:59 (ALTech) SY Yoon Note Added: 0009314
2022-01-13 17:16 (PM) Carey Lu File Added: ALT Fii SWAN tracking list 220114_v1.xlsx
2022-01-13 17:16 (PM) Carey Lu Note Added: 0009347
2022-01-13 17:17 (PM) Carey Lu File Added: K18X001.00-DFM report_220113.xlsx
2022-01-14 16:44 (ALTech) SY Yoon Note Added: 0009350
2022-01-20 19:15 (PM) Carey Lu File Added: ALT Fii SWAN tracking list 220121v1.xlsx
2022-01-20 19:15 (PM) Carey Lu File Added: K18X001.00-DFM report_220121.xlsx
2022-01-20 19:15 (PM) Carey Lu Note Added: 0009359
2022-01-21 19:16 (ALTech) SY Yoon Note Added: 0009363
2022-01-26 17:54 (PM) Carey Lu File Added: ALT Fii SWAN tracking list 220126v1.xlsx
2022-01-26 17:54 (PM) Carey Lu Note Added: 0009380
2022-01-27 13:20 (ALTech) SY Yoon Note Added: 0009385
2022-02-07 19:31 (HW) Sean Chiang Note Added: 0009401
2022-02-10 19:59 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220211_v2.xlsx
2022-02-10 19:59 (HW) Sean Chiang File Added: K18X001.00-DFM report_220210.xlsx
2022-02-10 19:59 (HW) Sean Chiang Note Added: 0009431
2022-02-11 17:16 (ALTech) SY Yoon Note Added: 0009439
2022-02-11 17:26 (HW) Sean Chiang Issue Monitored: (HW) Tom Lee
2022-02-11 17:27 (HW) Sean Chiang Issue Monitored: (RD) Fu-chiang Young
2022-02-16 08:04 (ALTech) Lonnie Kim File Added: FFC Cable Acceleration Test condition_R10_220215.pptx
2022-02-16 08:04 (ALTech) Lonnie Kim Note Added: 0009449
2022-02-16 08:04 (ALTech) Lonnie Kim Issue Monitored: (ALTech) Hyunsik Kim
2022-02-17 20:07 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220218_v1.xlsx
2022-02-17 20:07 (HW) Sean Chiang Note Added: 0009470
2022-02-18 16:03 (ALTech) SY Yoon Note Added: 0009475
2022-02-24 17:28 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220225_v1.xlsx
2022-02-24 17:28 (HW) Sean Chiang Note Added: 0009504
2022-02-25 16:17 (ALTech) SY Yoon Note Added: 0009510
2022-03-04 17:45 (PM) Sheila Tu File Added: ALT Fii SWAN tracking list 220307.xlsx
2022-03-04 17:45 (PM) Sheila Tu Note Added: 0009547
2022-03-07 11:05 (PM) Dennis Lu File Added: Schedule_ SWAN & Eagle_0307-ALT.pptx
2022-03-07 11:05 (PM) Dennis Lu Note Added: 0009551
2022-03-07 20:08 (ALTech) SY Yoon Note Added: 0009565
2022-03-10 22:03 (PM) Sheila Tu File Added: ALT Fii SWAN tracking list 220311.xlsx
2022-03-10 22:03 (PM) Sheila Tu Note Added: 0009582
2022-03-11 17:05 (ALTech) SY Yoon Note Added: 0009593
2022-03-17 20:03 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220318v1.xlsx
2022-03-17 20:03 (HW) Sean Chiang Note Added: 0009643
2022-03-18 16:08 (ALTech) SY Yoon Note Added: 0009648
2022-03-24 18:45 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220325 v1.xlsx
2022-03-24 18:45 (HW) Sean Chiang Note Added: 0009698
2022-03-25 15:34 (ALTech) SY Yoon Note Added: 0009703
2022-03-31 19:10 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220401 V2.xlsx
2022-03-31 19:10 (HW) Sean Chiang Note Added: 0009772
2022-04-01 16:24 (ALTech) SY Yoon Note Added: 0009784
2022-04-07 14:49 (PM) Sheila Tu File Added: ALT Fii SWAN tracking list 220407v2.xlsx
2022-04-07 14:49 (PM) Sheila Tu Note Added: 0009836
2022-04-11 19:11 (HW) Sean Chiang Issue Monitored: Rick Chen
2022-04-12 15:11 (ALTech) SY Yoon Note Added: 0009875
2022-04-14 16:28 (HW) Sean Chiang Issue Monitored: (PM) Canon Hsieh
2022-04-14 16:33 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220414 v1.xlsx
2022-04-14 16:33 (HW) Sean Chiang Note Added: 0009887
2022-04-15 14:41 (ALTech) SY Yoon Note Added: 0009890
2022-04-21 17:48 (HW) Sean Chiang Assigned To => (HW) Sean Chiang
2022-04-21 17:48 (HW) Sean Chiang Status new => assigned
2022-04-21 17:55 (PM) Canon Hsieh File Added: ALT Fii SWAN tracking list 220421 V4.xlsx.xlsx
2022-04-21 17:55 (PM) Canon Hsieh Note Added: 0009910
2022-04-26 19:58 (ALTech) SY Yoon Note Added: 0009937
2022-04-28 19:39 (PM) Canon Hsieh File Added: ALT Fii SWAN tracking list 220428_V1.xlsx
2022-04-28 19:39 (PM) Canon Hsieh Note Added: 0009947
2022-05-02 10:06 (ALTech) Lonnie Kim File Added: SWAN tracking list_220428.png
2022-05-02 10:06 (ALTech) Lonnie Kim Note Added: 0009952
2022-05-02 10:36 (ALTech) SY Yoon Note Added: 0009953
2022-05-05 20:43 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220505_v1.xlsx
2022-05-05 20:43 (HW) Sean Chiang Note Added: 0009971
2022-05-12 19:02 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220512 v1.xlsx
2022-05-12 19:02 (HW) Sean Chiang Note Added: 0010018
2022-05-16 09:50 (ALTech) SY Yoon Note Added: 0010035
2022-05-19 19:25 (PM) Canon Hsieh File Added: ALT Fii SWAN tracking list 220519 v2.xlsx
2022-05-19 19:25 (PM) Canon Hsieh Note Added: 0010051
2022-05-22 21:53 (ALTech) SY Yoon Note Added: 0010056
2022-05-26 18:07 (PM) Canon Hsieh File Added: ALT Fii SWAN tracking list 220526 v2.xlsx
2022-05-26 18:07 (PM) Canon Hsieh Note Added: 0010079
2022-05-30 19:28 (ALTech) SY Yoon Note Added: 0010091
2022-06-02 21:02 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220602 v1.xlsx
2022-06-02 21:02 (HW) Sean Chiang Note Added: 0010108
2022-06-03 16:36 (ALTech) SY Yoon Note Added: 0010109
2022-06-09 18:40 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220610 v1.xlsx
2022-06-09 18:40 (HW) Sean Chiang Note Added: 0010142
2022-06-13 09:12 (ALTech) SY Yoon Note Added: 0010151
2022-06-16 21:57 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220610 v1-2.xlsx
2022-06-16 21:57 (HW) Sean Chiang Note Added: 0010192
2022-06-17 12:34 (HW) Sean Chiang Issue Monitored: (PM) Eva Sun
2022-06-17 12:36 (PM) Eva Sun File Added: ALT Fii SWAN tracking list 220616 v1.xlsx
2022-06-17 12:36 (PM) Eva Sun Note Added: 0010198
2022-06-17 13:09 (ALTech) SY Yoon Note Added: 0010199
2022-06-17 13:36 (ALTech) Lonnie Kim File Added: Semtech_05072018_RClamp3331ZA-1500393.pdf
2022-06-17 13:36 (ALTech) Lonnie Kim File Added: RClamp5031ZA.pdf
2022-06-17 13:36 (ALTech) Lonnie Kim File Added: ESD.pdf
2022-06-17 13:36 (ALTech) Lonnie Kim Note Added: 0010200
2022-06-23 18:28 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220623.xlsx
2022-06-23 18:28 (HW) Sean Chiang Note Added: 0010237
2022-06-24 19:18 (ALTech) SY Yoon Note Added: 0010246
2022-06-30 18:37 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220630 v1.xlsx
2022-06-30 18:37 (HW) Sean Chiang Note Added: 0010281
2022-07-01 08:04 (ALTech) SH Son File Added: ALT Fii SWAN tracking list 220630 v2.xlsx
2022-07-01 08:04 (ALTech) SH Son Note Added: 0010284
2022-07-01 13:23 (ALTech) SY Yoon Note Added: 0010293
2022-07-07 19:47 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220707 v2.xlsx
2022-07-07 19:47 (HW) Sean Chiang Note Added: 0010331
2022-07-08 15:01 (ALTech) SY Yoon Note Added: 0010336
2022-07-14 18:28 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220714 v1.xlsx
2022-07-14 18:28 (HW) Sean Chiang Note Added: 0010377
2022-07-15 13:59 (ALTech) SY Yoon Note Added: 0010389
2022-07-21 23:11 (HW) Sean Chiang Note Added: 0010440
2022-07-21 23:11 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220721 v2.xlsx
2022-07-22 17:16 (ALTech) SY Yoon Note Added: 0010455
2022-07-28 19:38 (HW) Sean Chiang Note Added: 0010485
2022-07-28 19:38 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220728 v1.xlsx
2022-07-29 19:21 (ALTech) SY Yoon Note Added: 0010489
2022-08-04 18:38 (HW) Sean Chiang Note Added: 0010533
2022-08-04 18:38 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220804 v2.xlsx
2022-08-04 19:01 (ALTech) Lonnie Kim Note Added: 0010534
2022-08-04 19:01 (ALTech) Lonnie Kim File Added: ALT adding items.xlsx
2022-08-05 17:13 (ALTech) SY Yoon Note Added: 0010542
2022-08-05 17:13 (ALTech) SY Yoon File Added: image.png
2022-08-05 18:59 (HW) Sean Chiang Issue Monitored: (RD) Jay Lin
2022-08-05 18:59 (HW) Sean Chiang Issue Monitored: (HW) Cooper Kung
2022-08-11 20:16 (HW) Sean Chiang Note Added: 0010605
2022-08-11 20:16 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220811v3.xlsx
2022-08-12 12:42 (ALTech) SY Yoon Note Added: 0010622
2022-08-12 12:42 (ALTech) SY Yoon File Added: ALT Fii SWAN tracking list 220812v1.xlsx
2022-08-18 19:13 (HW) Sean Chiang Note Added: 0010658
2022-08-18 19:14 (HW) Sean Chiang Note Added: 0010659
2022-08-18 19:14 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220818v2.xlsx
2022-08-19 16:43 (ALTech) SY Yoon Note Added: 0010668
2022-08-19 16:43 (ALTech) SY Yoon File Added: ALT Fii SWAN tracking list 220819v1.xlsx
2022-08-19 16:48 (ALTech) SY Yoon Note Edited: 0010668
2022-08-25 22:25 (HW) Sean Chiang Note Added: 0010720
2022-08-25 22:25 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220825 v1.xlsx
2022-08-26 15:54 (ALTech) SY Yoon Note Added: 0010726
2022-08-26 15:54 (ALTech) SY Yoon File Added: ALT Fii SWAN tracking list 220826 v1.xlsx
2022-08-31 23:52 (HW) Sean Chiang Note Added: 0010759
2022-08-31 23:52 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220831 v1.xlsx
2022-09-01 13:27 (ALTech) SY Yoon Note Added: 0010764
2022-09-01 13:27 (ALTech) SY Yoon File Added: ALT Fii SWAN tracking list 220901 v1.xlsx
2022-09-07 18:33 (HW) Sean Chiang Note Added: 0010827
2022-09-07 18:33 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220907v1.xlsx
2022-09-08 12:50 (ALTech) SY Yoon Note Added: 0010834
2022-09-08 12:50 (ALTech) SY Yoon File Added: ALT Fii SWAN tracking list 220908v1.xlsx
2022-09-15 18:44 (HW) Sean Chiang Note Added: 0010874
2022-09-15 18:44 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220915v2.xlsx
2022-09-16 19:43 (ALTech) SY Yoon Note Added: 0010886
2022-09-16 19:43 (ALTech) SY Yoon File Added: ALT Fii SWAN tracking list 220916v1.xlsx
2022-09-22 17:33 (HW) Sean Chiang Note Added: 0010915
2022-09-22 17:33 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220922v2.xlsx
2022-09-23 15:12 (ALTech) SY Yoon Note Added: 0010925
2022-09-23 15:12 (ALTech) SY Yoon File Added: ALT Fii SWAN tracking list 220923v1.xlsx
2022-09-29 18:13 (HW) Sean Chiang Note Added: 0010951
2022-09-29 18:13 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 220929 v1.xlsx
2022-09-30 15:21 (ALTech) SY Yoon Note Added: 0010958
2022-09-30 15:21 (ALTech) SY Yoon File Added: ALT Fii SWAN tracking list 220930 v1.xlsx
2022-10-06 18:31 (HW) Sean Chiang Note Added: 0010982
2022-10-06 18:31 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 221006_v1.xlsx
2022-10-07 14:52 (ALTech) SY Yoon Note Added: 0010991
2022-10-07 14:52 (ALTech) SY Yoon File Added: ALT Fii SWAN tracking list 221007_v1.xlsx
2022-10-13 20:34 (HW) Sean Chiang Note Added: 0011044
2022-10-13 20:34 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 221013v1.xlsx
2022-10-14 16:18 (ALTech) SY Yoon Note Added: 0011049
2022-10-14 16:18 (ALTech) SY Yoon File Added: ALT Fii SWAN tracking list 221014v1.xlsx
2022-10-20 19:15 (HW) Sean Chiang Note Added: 0011085
2022-10-20 19:15 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 221020 v2.xlsx
2022-10-21 12:43 (ALTech) SY Yoon Note Added: 0011095
2022-10-21 12:43 (ALTech) SY Yoon File Added: ALT Fii SWAN tracking list 221021 v1.xlsx
2022-10-27 18:46 (HW) Sean Chiang Note Added: 0011123
2022-10-27 18:46 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 221027v1.xlsx
2022-10-28 16:03 (ALTech) SY Yoon Note Added: 0011129
2022-10-28 16:03 (ALTech) SY Yoon File Added: ALT Fii SWAN tracking list 221028v1.xlsx
2022-11-03 20:53 (HW) Sean Chiang Note Added: 0011160
2022-11-03 20:53 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 221103 v1.xlsx
2022-11-10 20:17 (HW) Sean Chiang Note Added: 0011203
2022-11-10 20:17 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 221110 v1.xlsx
2022-11-10 20:17 (HW) Sean Chiang Note Edited: 0011203
2022-11-11 14:13 (ALTech) SY Yoon Note Added: 0011211
2022-11-11 14:13 (ALTech) SY Yoon File Added: ALT Fii SWAN tracking list 221111 v1.xlsx
2022-11-17 23:22 (HW) Sean Chiang Note Added: 0011248
2022-11-17 23:22 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 221117 v1.xlsx
2022-11-18 13:39 (ALTech) SY Yoon Note Added: 0011252
2022-11-18 13:39 (ALTech) SY Yoon File Added: ALT Fii SWAN tracking list 221118 v1.xlsx
2022-11-24 20:20 (HW) Sean Chiang Note Added: 0011304
2022-11-24 20:20 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 221124 v1.xlsx
2022-11-25 17:56 (ALTech) SY Yoon Note Added: 0011323
2022-11-25 17:56 (ALTech) SY Yoon File Added: ALT Fii SWAN tracking list 221125 v1.xlsx
2022-12-01 17:49 (HW) Sean Chiang Note Added: 0011362
2022-12-01 17:49 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 221201v1.xlsx
2022-12-02 15:07 (ALTech) SY Yoon Note Added: 0011370
2022-12-02 15:07 (ALTech) SY Yoon File Added: ALT Fii SWAN tracking list 221202v1.xlsx
2022-12-08 19:19 (HW) Sean Chiang Note Added: 0011434
2022-12-08 19:19 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 221208_v2.xlsx
2022-12-09 16:10 (ALTech) SY Yoon Note Added: 0011448
2022-12-09 16:10 (ALTech) SY Yoon File Added: ALT Fii SWAN tracking list 221209_v2.xlsx
2022-12-22 19:42 (HW) Sean Chiang Note Added: 0011549
2022-12-22 19:42 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 221222 v1.xlsx
2022-12-23 12:42 (ALTech) SY Yoon Note Added: 0011559
2022-12-23 12:42 (ALTech) SY Yoon File Added: ALT Fii SWAN tracking list 221223 v1.xlsx
2023-01-05 19:48 (HW) Sean Chiang Note Added: 0011679
2023-01-05 19:48 (HW) Sean Chiang File Added: ALT Fii SWAN tracking list 230105.xlsx
2023-01-09 18:24 (ALTech) SY Yoon Note Added: 0011727
2023-01-09 18:24 (ALTech) SY Yoon File Added: ALT Fii SWAN tracking list 230106.xlsx
2023-01-12 18:29 (Sales) Miya Wang Note Added: 0011753
2023-01-12 18:29 (Sales) Miya Wang File Added: ALT Fii SWAN tracking list 230112 v3.xlsx
2023-01-13 15:26 (ALTech) SY Yoon Note Added: 0011772
2023-01-13 15:26 (ALTech) SY Yoon File Added: ALT Fii SWAN tracking list 230113.xlsx
2025-04-07 10:12 (PM) Sheila Tu Status assigned => closed
2025-04-07 10:12 (PM) Sheila Tu Resolution open => fixed